Manuel Fuel Feeding, ÜKY/W Hot Water Boiler User Manual 

MAINTENANCE AND BOILER CLEANING 

For your system to work efficiently, regular maintenance is required by specialist teams according to 
the manufacturer's instructions. 
 
Regular checks: 
• The water level should always be checked. The hydrometer (water level indicator) should be 
marked after the first filling of the system. If water level or pressure drops below the static pressure 
or system setting, water addition (boiler cold) must be done to the system. To protect the system 
and the boiler from corrosion, the water to be fed into the system needs to be softened according to 
local settings. 
• Check that the front doors are closed properly, and if necessary, the door wickets should be 
replaced. 
• Check that there is a gas leak from the chimney connection. If there is a leak, it must be repaired. 
• Boiler heating surfaces should be checked. The formation of the corporation depends on the type 
of fuel used and the amount of combustion air. If it is understood that the outlet water temperature 
can not rise to the usual values in usual conditions, the boiler surfaces are treated, the heat transfer 
surfaces of the boiler should be cleaned. 
 
Boiler cleaning: 
It should be done when the boiler is cold.  
 
To clear the boiler: 
• Clean between the water jackets with the help of a spatula.  
• Bitumen on the walls of the boiler forms a layer, which will prevent the energy that is released in 
the boiler from passing through the water, thus resulting in low efficiency. To prevent this, all heating 
surfaces should be cleaned regularly with the help of a spatula or as required. 

• Boiler outer cover sheets can be cleaned as needed. 

 

Maintenance: 
The  system  has  a  contracted  service  before  each  working  season;  We 
strongly  advise  you  to  call  our  authorized  service  to  check  the  boiler, 
fittings,  electrical  connections,  syringe.  Never  do  maintenance  work 
without the help of an expert. 
 
 
 
 
 
 

 

Chimney cleaning should be done by a firm that has successfully passed certification training 

in your city organized by the fire department chairs. 

 

 

Содержание UKY/W

Страница 1: ...Manuel Feeding Wood Fired Boiler User Manual NL SOY Yap Malzemeleri Sanayi ve Ticaret Ltd ti Pancar Organize Sanayi B lgesi 2 Etap No 2 Torbal ZM R Tel 90 444 35 32 Fax 90 232 469 2412 www unmak com...

Страница 2: ...ION PLACE 3 SAFETY PRECAUTIONS 5 ELECTRICAL INSTALLATION INSTRUCTIONS 6 BOILER FEATURES 7 RULES FOR HEATING INSTALLATION 8 USAGE AND INSTALLATION OF DRAFT REGULATOR 11 START UP 12 INFORMATION ON COMBU...

Страница 3: ...able for direct use of water However it can produce hot water with the help of a water heater or heat exchanger The energy required for domestic water will be taken from the boiler s energy UNMAK boil...

Страница 4: ...tion combustion and maintenance of the boiler It must be spaced from the wall for service needs For this purpose the dimensions in the paragraph titled Installation location dimensions must be applied...

Страница 5: ...the boiler room boiler room All electrical and water installations must be carried out by authorized plumbers in accordance with all applicable legal and technical rules and regulations The fuels to b...

Страница 6: ...never be used It should be plastered inside and outside of the rectangular chimney It should be ensured that fresh air is continuously introduced into the area where the boiler is installed Reference...

Страница 7: ...the outside dimensions of the boiler Thanks to the base the boiler is protected from the water that can accumulate on the ground The fire should not be approached when the lid of the burning boiler i...

Страница 8: ...ustion Chamber Depth mm 430 500 430 510 Combustion Chamber Volume dm3 47 7 65 7 94 6 112 2 Combustion Chamber Dimensions mm 150 300 180 355 190 500 Water Volume lt 45 70 80 100 Boiler Weight kg 185 23...

Страница 9: ...the circulation pump is installed the failure of the electrical connections to come down will eliminate the problem of entering the water into the pump Perpendicular installation of the shaft should a...

Страница 10: ...ere and the air in the system is discharged It is recommended to use separate expansion tanks according to their capacities for each boiler in the installation That is it is not correct to connect the...

Страница 11: ...measures are taken after the first filling there is no damage caused by the oxygen in the water Oxidation is mostly caused by oxygen which is involved in the heating water during operation Warning ag...

Страница 12: ...to the threads and screw the control into the the tapping securely but not too tightly as the threads may be demaged if the control is turned too far Carefully insert the arm into the hole from right...

Страница 13: ...as a general rule the air supplied to the fuel must be at a certain rate The air required for a certain amount of fuel should not be too much If the amount of air which is changed depending on the ty...

Страница 14: ...diagram below Horizontal connections and equipment such as elbows should be avoided A vertical steel pipe should not be used as a chimney the chimney must have an inside and an outer surface The oute...

Страница 15: ...ends on the type of fuel used and the amount of combustion air If it is understood that the outlet water temperature can not rise to the usual values in usual conditions the boiler surfaces are treate...

Страница 16: ...re are no holes or cracks in any part of the boiler If it is not enough yet consult your abdomen Have your chest isolated Excess fuel consump tion Poor quality fuel High chimney draft Excess air Insuf...

Страница 17: ...ted Add fuel to the winner Panel writes Ht2 error Temperature sensor The temperature sensor is not installed or may be removed The temperature sensor may be faulty Fit the heat sensor firmly Call a se...

Отзывы: