Manuel Fuel Feeding, ÜKY/W Hot Water Boiler User Manual
START-UP
The following steps should be followed for the initial start of the boiler:
Check for any visible glitches in the installation. If there is an error, please refer to the "Information on
Usage Errors" page and correct the malfunctions.
Observe that the hydrometer shows the water height and there is 1-2 meters of water according to
the scale
Open the middle cover and load fuel into the boiler.
Open the lower cover to ignite the fuel. Do not use flammable substances to ignite.
Close the bottom cover and turn the draft regulator by hand and adjust at 60-70 °C.
You may add fuel after the fuel you add for ignition is completely ignited.
You can use the secondary air hole in the middle as needed.
Do not use flammable substances to ignite.
INFORMATION ON COMBUSTION
In order to ensure correct combustion, as a general rule, the
air supplied to the fuel must be at a certain rate. The air
required for a certain amount of fuel should not be too much.
If the amount of air which is changed depending on the type
of fuel is less than the required amount of carbon monoxide,
the energy produced is reduced, the combustion starts, the
combustion efficiency decreases, the air quantity is
decreasing, the carbon monoxide decreases while the non-
combustion air is heated from the chimney by heating in the furnace, the combustion is deteriorated
and the combustion efficiency It decreases.
If the temperature of the flue gas is above the accepted values, excess energy will be ejected from the
flue to the atmosphere. The material, the way of construction and the
connection of the chimneys are important in terms of high combustion
efficiency, low heating cost and protection of the environment.
The chimney must be good for burning to be good. It is recommended
to use a high temperature resistant firebrick and stainless steel
chimneys. The horizontal smoke ducts should be connected to the