14
Please contact Universal
®
Gym Equipment/FFA Corp. for missing or defective parts at one of the following:
Phone 1-800-
472-9856 or Fax 1-662-495-5038 or E-mail at [email protected].
Mailing address: Universal
®
Gym Equipment/FFA Corp. - 100 Tubb Ave. West Point, MS 39773.
Website www.universalgymequipment.com
FIGURE 5
Step 41.
Step 42.
Step 43.
Step 44.
Step 45.
Step 46.
Step 47.
Attach four BEARING HOUSINGS (41) to PEC DEC SUPPORT (11) with 1/2” x 1-3/4” HEX HEAD BOLTS (87),
1/2” WASHERS (99) and 1/2” NYLON NUTS (103)
Attach PEC DEC SUPPORT (11) and PEC DEC PULLEY BLOCK (28) to PEC DEC UPRIGHT (5) with 1/2” x 4-1/4”
HEX HEAD BOLTS (84), 1/2” WASHERS (99) and 1/2” NYLON NUTS (103).
Push 50mm SQUARE PLUGS (70) into end of PEC DEC CAM (15 LEFT & 16 RIGHT).
Slide 1” SPACERS (98) onto shaft of PEC DEC CAM (15 LEFT & 16 RIGHT) and insert PEC DEC CAMS into
BEARING HOUSINGS (41).
Using an allen wrench, tighten SET SCREWS in all four BEARING HOUSINGS (41).
Attach PEC DEC ARMS (14) to PEC DEC CAM (15 LEFT & 16 RIGHT) with 1/2” x 3-1/4” HEX HEAD BOLTS (85A),
1/2” WASHERS (99), 1/2” NYLON NUTS (103) and 1/2” CAP for NUT (73).
Insert RIGHT ANGLE ROLLER HANDLE BARS (19A) into PEC DEC ARMS (14) and fasten with 1/2” WASHERS
(99), 1/2” NYLON NUTS (103) and 1/2” CAP for NUTS (73).
IMPORTANT:
The BEARING HOUSINGS (41) have SET SCREWS on one side. The BEARING
HOUSINGS
must
be mounted with the SET SCREWS on
top
as shown in DETAIL.