![Universal Laser Systems VLS2.30 Скачать руководство пользователя страница 98](http://html1.mh-extra.com/html/universal-laser-systems/vls2-30/vls2-30_user-manual_1058520098.webp)
Maintenance Schedule
We recommend the following schedule:
As necessary
•
Clean engraving table
•
Clean main enclosure
•
Clean top door window
Every 8 hours of engraving
•
Clean X-Axis and Y-Axis bearings
•
Clean X-Axis and Y-Axis rails and bearing
tracks
•
Clean X-Axis belt
•
Check beam window, #2 mirror, #3 mirror
and Focus lens for debris. Clean ONLY if
dirty.
Every month
•
Clean cooling fan filters
•
Clean Z-Axis lead screws with white lithium
grease
•
Check for X-Axis and Y-Axis belt wear.
Replace as necessary.
•
Check and/or clean X-Axis and Y-Axis drive
gears
•
Check for X-Axis and Y-Axis bearing wear.
Replace as necessary.
•
Inspect system for loose screws and
mechanical parts. Tighten as necessary.
Every 6 months
•
Clean exhaust plenum
Note:
If you have any questions about maintaining the laser system, please contact the ULS Customer
Service Team.
98
Содержание VLS2.30
Страница 1: ...VLS Desktop User Guide VLS2 30 VLS3 50 www ulsinc com Revision 2012 08...
Страница 5: ...Chapter 1 Specifications 5...
Страница 8: ...Chapter 2 Safety 8...
Страница 9: ......
Страница 15: ......
Страница 16: ......
Страница 19: ...Chapter 3 Installation 19...
Страница 36: ...Chapter 4 Operation 36...
Страница 62: ......
Страница 68: ...Chapter 5 Accessories 68...
Страница 80: ...Example Connection for PNP mode Example Connection for NPN mode 80...
Страница 92: ...Chapter 6 Maintenance 92...
Страница 99: ...www ulsinc com...