Q3 1000-2000A
26
C
o
m
m
is
si
o
ni
ng
Commissioning Q3 x/x-x with REG4
Check the following connections before commissioning
Observe the type plate!
Basic connection - power connections Q3
Power supply
power
bolts X10:14, X10:15, X10:16
Power supply
auxiliary voltage
terminals X5:17, X5:18
Motor connection
A1/A2
bolts X10:10, X10:13
Protecting earth
PE
earthing screws PE on the housing
Control connections
Enable
contact between X1:3 and X1:4
Command value
signal X1:6, GND X1:8a
Actual value
signal X1:9, GND X1:8b
Shields
X1:8
Control electronics REG4
Switch
S4
PI amplification
position 4
Switch
S5
I-term
position 4
Switch
S8
D amplification
position 8
Switch
S9
actual value
position 8
Potentiometer
I
1
peak current
10%
Potentiometer
I
2
peak current
10%
Potentiometer
I
D
continuous current 100%
Potentiometer
X
P
amplification
50%
Potentiometer
INT
integrato
left full scale
Potentiometer
n
max
speed
left full scale
Potentiometer
offset
offset
50%
Содержание Classic Q3 400 Series
Страница 10: ...Classsic Q3 1000 2000A 10 Dimensions ...
Страница 11: ...3 Electrical installation Q3 1000 2000A 11 Dimensions ...
Страница 13: ...3 Electrical installation Q3 1000 2000A 13 Connections ...
Страница 18: ...Q3 1000 2000A 18 Free ...
Страница 20: ...Q3 1000 2000A 20 Field regulator is not installed External field current regulator F2 1 xx Field connection ...
Страница 23: ...5 Adjustments Q3 1000 2000A 23 Circuit diagram ...