17
FACTORY BUILT CHIMNEY
When a metal prefabricated chimney is used, the manufacturer’s installation instructions must be followed. You must also purchase (from
the same manufacturer) and install the ceiling support package or wall pass-through and “T” section package, firestops (where needed),
insulation shield, roof flashing, chimney cap, etc. Maintain proper clearance to the structure as recommended by the manufacturer. The
chimney must be the required height above the roof or other obstructions for safety and proper draft operation.
27
Содержание 7700
Страница 10: ...10...
Страница 38: ...28 NOTES 38...
Страница 39: ...29 NOTES 39...
Страница 58: ...Client QC inc Date March 6 2011 Project No Page 8 of 13 IV A 1 DILUTION TUNNEL...
Страница 60: ...Client QC inc Date March 6 2011 Project No Page 10 of 13 IV B 2 DILUTION TUNNEL SAMPLE SYSTEMS Figure 3...
Страница 103: ......
Страница 104: ...Run 1 Cat 1...
Страница 105: ...run 2 Cat 4...
Страница 106: ...Run 3 cat 3...
Страница 107: ...Run 4 Cat 2...
Страница 108: ......
Страница 135: ......
Страница 136: ......
Страница 137: ......
Страница 138: ......
Страница 139: ......
Страница 140: ......
Страница 141: ......
Страница 142: ......
Страница 143: ......
Страница 144: ......
Страница 145: ......
Страница 146: ......
Страница 147: ......
Страница 148: ......
Страница 149: ......
Страница 150: ......
Страница 151: ......
Страница 152: ......
Страница 153: ......
Страница 154: ......
Страница 155: ......
Страница 156: ......
Страница 157: ......
Страница 158: ......
Страница 159: ......
Страница 160: ......
Страница 161: ......
Страница 162: ......
Страница 163: ......
Страница 164: ......
Страница 165: ......
Страница 166: ......
Страница 167: ......
Страница 169: ......
Страница 170: ......
Страница 172: ......
Страница 173: ......
Страница 174: ......
Страница 175: ......