FURNACE INSTALLATION
LOCATING YOUR FURNACE
(INSURE THAT THE REQUIRED MAINTENANCE CLEARANCES ARE MAINTAINED)
Your furnace must be installed as shown in this manual and in compliance with all local and national codes.
It is of the utmost importance that the clearances to combustible materials be strictly adhered to during installation of the furnace. Refer
to the table and diagrams below for minimum required clearances.
Dimension
Inch
mm
A
Backwall to Furnace
29
737
B
Sidewall to Furnace
10
254
C
Sidewall to Flue
18
458
D
Backwall to Flue
18
458
E
Supply Duct (first 6 feet)
6
153
F
Supply Duct (after first 6 feet)
1
26
G
Minimum Duct height
8
204
INSTALLATION OPTIONS
The installation of this furnace includes supplying electrical power, return (fresh air) ductwork, and supply air ductwork. This furnace
may be installed in three different configurations.
1)
Stand alone wood furnace
2)
Add-on wood furnace
The furnace also has several additional kits that may be installed.
• GE7B - Blower Kit (Required)
•
GE7FAK - Fresh air Kit (Optional)
•
GE7CAP - Cold Air Plenum (Optional)
See kit installation section in this manual and as supplied with your kits to ensure proper assembly, installation and operation of your
new furnace.
If installing in an area with a fan it should not be allowed to create negative pressure in the room where the furnace is installed.
Back wall / Arrière Mur
Side w
all / P
ar
oi La
tér
ale
Side w
all / P
ar
oi La
tér
ale
Back wall / Arrière Mur
Side w
all / P
ar
oi La
tér
ale
Side w
all / P
ar
oi La
tér
ale
Back w
all / A
rr
ièr
e M
ur
Ceiling / Plafond
Floor Protector / Protection de Plancher
C
B
A
J
K
L
H
E
E
D
D
E
F
G
D
P
M
Q
N
R
R
Back wall / Arrière Mur
Side w
all / P
ar
oi La
tér
ale
Side w
all / P
ar
oi La
tér
ale
Back wall / Arrière Mur
Side w
all / P
ar
oi La
tér
ale
Side w
all / P
ar
oi La
tér
ale
Back w
all / A
rr
ièr
e M
ur
Ceiling / Plafond
Floor Protector / Protection de Plancher
C
B
A
J
K
L
H
E
E
D
D
E
F
G
D
P
M
Q
N
R
R
CLEARANCE TO COMBUSTIBLES
CLEARANCE TO COMBUSTIBLES
15
Содержание 7700
Страница 10: ...10...
Страница 38: ...28 NOTES 38...
Страница 39: ...29 NOTES 39...
Страница 58: ...Client QC inc Date March 6 2011 Project No Page 8 of 13 IV A 1 DILUTION TUNNEL...
Страница 60: ...Client QC inc Date March 6 2011 Project No Page 10 of 13 IV B 2 DILUTION TUNNEL SAMPLE SYSTEMS Figure 3...
Страница 103: ......
Страница 104: ...Run 1 Cat 1...
Страница 105: ...run 2 Cat 4...
Страница 106: ...Run 3 cat 3...
Страница 107: ...Run 4 Cat 2...
Страница 108: ......
Страница 135: ......
Страница 136: ......
Страница 137: ......
Страница 138: ......
Страница 139: ......
Страница 140: ......
Страница 141: ......
Страница 142: ......
Страница 143: ......
Страница 144: ......
Страница 145: ......
Страница 146: ......
Страница 147: ......
Страница 148: ......
Страница 149: ......
Страница 150: ......
Страница 151: ......
Страница 152: ......
Страница 153: ......
Страница 154: ......
Страница 155: ......
Страница 156: ......
Страница 157: ......
Страница 158: ......
Страница 159: ......
Страница 160: ......
Страница 161: ......
Страница 162: ......
Страница 163: ......
Страница 164: ......
Страница 165: ......
Страница 166: ......
Страница 167: ......
Страница 169: ......
Страница 170: ......
Страница 172: ......
Страница 173: ......
Страница 174: ......
Страница 175: ......