background image

IMT120 15 

2

DEVICE MUST NOT BE ALTERED OR MODIFIED 

AFTER SHIPMENT. CONSULT UE IF MODIFICATION IS 

NECESSARY. 

The 120 Series temperature switch utilizes either a 

liquid filled sensing stem (immersion stem, direct 

mounting) or liquid filled sensing bulb (bulb & 

capillary, remote mounting) to detect a temperature 

change. The response at a pre-determined set 

point(s), actuates a SPDT, dual SPDT, or DPDT snap-

acting micro switch(es), converting the temperature 

signal into an electrical signal. Control set point(s) 

may be varied by turning the adjustment hex (C120, 

F120) or the external knob(s) and pointer(s) (B121, 

B122, E121, E122, 820E, 822E) according to the 

procedures outlined (See Part II - Adjustments).

Please refer to the product technical datasheet at 

www.ueonline.com for product specifications. Date 

code format on nameplate is “YYWW” for year and week.

Part I - Installation

• 

Screwdriver

• 

Adjustable Wrench to 1-1/2”

Mounting

INSTALL DEVICE WHERE SHOCK, VIBRATION AND 

TEMPERATURE FLUCTUATIONS ARE MINIMAL. DO NOT 

INSTALL DEVICE IN AMBIENT TEMPERATURES THAT 

EXCEED PUBLISHED LIMITS ON THE NAMEPLATE.

DEVICE IS PROVIDED WITH TWO 3/4” NPT ELECTRICAL 

CONDUIT OPENINGS, EITHER OF WHICH OR 

BOTH CAN BE USED DURING INSTALLATION. A 

3/4” EXPLOSION-PROOF PLUG IS PROVIDED FOR 

PROPERLY PLUGGING THE UNUSED CONDUIT 

OPENING. THE EXPLOSION-PROOF PLUG MUST BE 

PROPERLY INSTALLED AND IS CERTIFIED AS PART 

OF THE DEVICE AND CARRIES NO INDIVIDUAL 

MARKINGS.

 

DO NOT KNOCKOUT ANY PLUGS ON EXPLOSION-

PROOF TYPES 820E OR 822E.

THE CONNECTION OF THE DEVICE SHALL BE MADE 

BY CABLE ENTRIES OR A STOPPING BOX SUITABLE 

FOR THE CONDITIONS OF USE AND CORRECTLY 

INSTALLED, AND CERTIFIED BY TYPE OF EXPLOSION 

PROTECTION - FLAMEPROOF ENCLOSURE ‘d’.

DEVICE SHOULD BE MOUNTED TO PREVENT 

MOISTURE FROM ENTERING THE ENCLOSURE. 

VERTICAL MOUNTING IS RECOMMENDED.

ALWAYS USE A WRENCH ON LOCAL MOUNT, 

IMMERSION STEM HEX (SEE DIMENSIONAL 

DRAWINGS). DO NOT TIGHTEN BY TURNING THE 

ENCLOSURE AS THIS WILL DAMAGE THE SENSOR AND 

WEAKEN WELDED JOINTS. 

The conduit connection must be properly sealed 

(potted) for horizontal installation. Device may be 

surface mounted via the four 1/4” screw holes on the 

enclosure or mounting bracket.

Type 820E and 822E

Units must be surface mounted. Drill mounting 

holes per Figure 1.

IF A SEAL FITTING IS REQUIRED, INSTALL THE 

NIPPLE AND THE SEAL FITTING PRIOR TO SURFACE 

MOUNTING THE CONTROLLER. 

Mounting Bulb and Capillary

Fully immerse the bulb and 6” of capillary in the con-

trol zone. For best control it is generally desirable to 

place the bulb close to the heating or cooling source 

in order to sense temperature fluctuations quickly. 

Be sure to locate the bulb so it will not be exposed to 

temperature beyond the device range limits. If a sepa-

rable well or union connector is used follow separate 

instructions included with them.

AVOID BENDING OR COILING THE CAPILLARY TUBE 

TIGHTER THAN 1/2” RADIUS. EXERCISE CAUTION 

WHEN MAKING BENDS NEAR THE CAPILLARY END.

Wiring

DISCONNECT ALL SUPPLY CIRCUITS BEFORE 

WIRING DEVICE. WIRE DEVICE IN ACCORDANCE 

WITH LOCAL AND NATIONAL  ELECTRICAL CODES. 

MAXIMUM RECOMMENDED WIRE SIZE IS 14 AWG AND 

RECOMMENDED TIGHTENING TORQUE FOR FIELD 

WIRING TERMINALS IS 7 TO 17 IN-LBS. IT IS IMPERATIVE 

TO USE PROPERLY RATED EXPLOSION-PROOF SEALING 

FITTINGS FOR ELECTRICAL WIRE ENTRY.

FIELD WIRING MUST BE RATED 90°C (194°F) 

MINIMUM. FOR AMBIENT TEMPERATURES BELOW 

-10°C (14°F), USE SUITABLE FIELD WIRING. 

DO NOT EXCEED ELECTRICAL RATINGS LISTED ON 

NAMEPLATE. OVERLOAD ON A SWITCH CAN CAUSE 

FAILURE, EVEN ON THE FIRST CYCLE.

THE INTERNAL GROUNDING TERMINAL SHALL BE USED 

AS THE PRIMARY EQUIPMENT GROUNDING MEANS. THE 

EXTERNAL GROUNDING TERMINAL IS NOT TO BE USED 

AS THE PRIMARY EQUIPMENT GROUNDING TERMINAL 

AND IS ONLY FOR SUPPLEMENTAL (SECONDARY) 

GROUNDING WHERE LOCAL AUTHORITIES PERMIT OR 

REQUIRE SUCH A CONNECTION. 

CLEARANCE FOR 

1/4 SCREW 

4 PLACES

Figure 1:

820E, 822E Mounting

6 3/8

161.9 mm 

9

228.6 mm 

Содержание 120 Series

Страница 1: ...ARE AS FOLLOWS 120 s Activation Plunger to adjustment screw hole gap joints 1 140 in 28 96 mm min length by 0 0039 in 0 099 mm max annular gap Plunger Guide to enclosure through threaded joints minim...

Страница 2: ...ION STEM HEX SEE DIMENSIONAL DRAWINGS DO NOT TIGHTEN BY TURNING THE ENCLOSURE AS THIS WILL DAMAGE THE SENSOR AND WEAKEN WELDED JOINTS The conduit connection must be properly sealed potted for horizont...

Страница 3: ...d turning the calibrating screw with another 3 16 open end wrench see figure 3 Turn clockwise to increase setting or counter clockwise to decrease setting Types B121 and E121 Remove adjustment cover A...

Страница 4: ...then re tighten screw A see Figure 5 NOTE Indicating Pointer Deflection 820E 822E The indicating pointers will read slightly low when the bulb temperature is 15 F above the controller setting This de...

Страница 5: ...B122 9 84 250 0 Immersion stem 2BS 8BS 9 31 236 6 Bulb capillary 13242 13322 10 0 254 0 Immersion stem Freeze protection 13273 13321 9 31 236 6 Bulb capillary Heat tracing Model Number Range Cap Lengt...

Страница 6: ...ELL INSTALLATIONS ii Except model 13273 13321 bulb OD is 1 4 6 35 mm 6 3 8 161 9 mm 3 3 16 81 0 mm 3 3 16 81 0 mm 7 177 8 mm 6 3 8 161 9 mm 14 11 16 373 1 mm 9 228 6 mm 7 8 22 2 mm 1 3 16 30 2 mm 3 4...

Страница 7: ...Y INSTALLED Il est imp ratif d utiliser des raccords d tanch it antid flagrants pour les fils lectriques Les types C120 F120 820E et 822E poss dent deux ouvertures de conduits lectriques de 3 4 NPT l...

Страница 8: ...disassembled by anyone other than authorized Seller s representatives EXCEPT FOR THE LIMITED WARRANTY OF REPAIR AND REPLACEMENT STATED ABOVE SELLER DISCLAIMS ALL WARRANTIES WHATSOEVER WITH RESPECT TO...

Отзывы: