![Union Instruments Pury250 S Скачать руководство пользователя страница 25](http://html.mh-extra.com/html/union-instruments/pury250-s/pury250-s_operating-instructions-manual_843042025.webp)
25
Transport, installation, and acceptance
6.4.3 Condensate line
NOTE
•
Route hose to avoid kinks, blockages and in a downward sloping manner.
•
Install output condensate in a frost-proof manner!
•
Discharge condensate without any back pressure!
•
A ventilated container is recommended – inspect/clean regularly.
Installation of condensate line
Compression fittings 6mm or ¼” are intended for the connection.
WARNING
Discharge of condensate!
Connection by qualified personnel only!
Observe the installation instructions of the compression fittings, installation by
trained personnel only!
Inspect and if necessary, assemble the hose and compression fittings.
Fig. 6.4:
Hose with clamping ring
Содержание Pury250 S
Страница 1: ...Operating Instructions Gas Cooler Pury250 S ...
Страница 5: ...1 Technical data 1 1 Dimensions Weight approx 12 6 kg 28lbs 5 ...
Страница 10: ...10 EC Declaration of Conformity ...
Страница 15: ...15 4 Protective equipment 4 1 Enclosure cover Fig 4 1 Enclosure cover ...
Страница 32: ...32 Transport installation and acceptance ...
Страница 34: ...34 Commissioning Switching on ...
Страница 36: ...36 Description of the HMI and operator control elements ...
Страница 49: ...49 Maintenance ...
Страница 53: ...53 ...
Страница 54: ...54 ...
Страница 58: ...58 Service ...
Страница 59: ...59 14 Related documents Declaration of Conformity Service documentation optional ...
Страница 60: ...60 Related documents ...
Страница 62: ...62 Disposal ...
Страница 64: ...64 Spare parts ...