< The following points are needed to check regularly and please take note as record > 

 
A.    MONTHLY  CHECKING  (or  1  time  per  bi-week  in  case  sensitive  equipments  needed  for 
high quality electric powers) 

Check point

 

Description

 

Standard

 

Arrangement

 

 
Total voltage of battery   
while float charging

 

 
The voltage of volt   
meter

 

 
Flat voltage  ×  the   
number of cell 
ex) 6cell for 12V

 

 
Arrange the number of   
cell by the float voltage 
charging 

 

 
Battery room   
Subsidiary Facilities

 

 
Battery room 
a. Condition 
b. Ventilation equipment

 
1. Keep dry & clean   
      with 10~35℃ 
2. Operate normally

 

 
a. To keep it dry and   
      clean as temperature 
      with 10~35℃ 
b. Abnormal operation   
      cases, take mending 
      or change 

 

 
B. 6MONTHLY CHECKING 

Checking point

 

Description

 

Standard

 

Arrangement

 

 
  Battery room & 
  subsidiary facilities

 

 
a. State of vent valve   
b. Safety facilities like   
      fire extinguisher   
c. State of connection

 

 
a.    Never close vent   
        valve remove dust   
b.    State of connection 
        between charger and   
        connect cable 
 

 

 
a. Remove dust from   
      vent valve and vent   
      hole   
b. Check the rafty   
      facilities   
c. Tighten connection   
      never short the   
      terminals 

 

 
  Appearance

 

 
a. Broken container crack 
    & damage   
b. Dust of container in   
      appearance

 

 

 
a. In case broken   
      container, crack &   
      damage, 

please 

contact   
      us 
b. Remove dust with   
      water, not gasoline or 
      flammable liquid 

 

 
C. CHECKING ANNUALLY 

Checking point

 

Description

 

Standard

 

Arrangement

 

 
  Connections

 

 
State of connection

 

 
Normal operation

 

 
Checking tight state of 
connection as well as   
removing rust on the   
terminals 

 

 

Содержание MXVOLTA

Страница 1: ...UNIKOR BATTERY CO LTD www ukbkorea com MXVOLTA BATTERY TECHNICAL HANDLING MANUAL...

Страница 2: ...EFORE USING 3 1 Unloading and checking 3 2 Installation and connection 3 3 Operational test and recharge 4 DAILY INSPECTION AND SERVICING 4 1 Treatment 4 2 Discharge 4 3 Charge A MONTHLY CHEKING B 6MO...

Страница 3: ...y and will not get any bad influence in spite of using a long period of time As it is no need to add pure water for MXVOLTA battery because we made MXVOLTA battery minimized to generate gas such as H2...

Страница 4: ...e pole when charging it and this is due to less excessive voltage by generation of hydrogen on alloy plate of lead and antimony When charging VRLA battery the over voltage of hydrogen generating was l...

Страница 5: ...nt but b is removable but a that is to say the electrolyte itself cannot be eliminated and so the electric discharge phenomenon by lead battery cannot completely be restrained However electric dischar...

Страница 6: ...as batteries furnished with charged status Recommended torque for connecting bolts and nuts are Size of Bolt Nut Torque M6 Bolt 11 1 N m M8 Bolt 20 2 N m M10 Bolt 30 3 N m M10 Nut 18 2 N m c After co...

Страница 7: ...w current discharge of 20 hours case Increasing voltage causes shorten time duration of discharge as Figure I shows Note C means nominal capacity with 20 hours rate Figure shows 6 Volt battery Figure...

Страница 8: ...eds during charging of initial current to the middle current electric current redcoats rapidly because being charge constant voltage at the last period of charging At the last period of charging keeps...

Страница 9: ...ent charge initially is with current remitted to 0 4C As it is hardly possible to check the tine charged full we recommended using a timer to be automatically stopped or the charger to be changed to f...

Страница 10: ...cases take mending or change B 6MONTHLY CHECKING Checking point Description Standard Arrangement Battery room subsidiary facilities a State of vent valve b Safety facilities like fire extinguisher c...

Страница 11: ...ber and fasten battery firmly when heavy vibration of shock is expected during service When connecting the batteries free air space must be provided for each battery The recommended minimum space betw...

Страница 12: ...ay 1 month 1 month 2 month 2 month 3 month 3 month 4 month 4 month 5 month 5 month 6 month 2 12 2 11 V 2 11 2 10 V 2 11 2 10 V 2 10 2 09 V 2 10 2 09 V 2 09 2 08 V 12 90 V 12 85 V 12 80 V 12 70 V 12 65...

Страница 13: ...0 97 0 97 0 98 0 99 0 99 0 100 0 10 h 96 0 97 0 97 5 97 5 100 0 100 0 100 0 20 h 97 0 98 0 98 0 98 0 50 3 h 62 5 75 0 82 0 85 0 62 5 75 0 87 5 90 0 6 h 75 0 89 0 90 0 92 0 75 0 93 0 96 0 97 0 10 h 90...

Страница 14: ...istance No leakage at 2 5psi Vent plug provided with builtin Ceramic filter Prevents ignition entering battery Prevents acid fumes from escaping from the battery Absorptive glass mat with heat oxidati...

Страница 15: ...oys dual complete seal construction of O ring and sealing of epoxy resin Synthetic rubber Epoxy resin with acid resistance and high adhesion strength SUS 304 material with acid resistance Cable wire o...

Страница 16: ...48000C 45 60 x 0 8026000 0 6019 x 100 60 1950 30 MIN 1 0000000 C 30 60 x 1 0000000 0 5 x 100 50 0000 20 MIN 1 2410000 C 20 60 x 1 2410000 0 413667 x 100 1 3667 10 MIN 1 6180000 C 10 60 x 1 6180000 0 2...

Отзывы: