CIB UNIGAS - M039191CA
26
LIMITATIONS OF USE
THE BURNER IS AN APPLIANCE DESIGNED AND CONSTRUCTED TO OPERATE ONLY AFTER BEING CORRECTLY CON-
NECTED TO A HEAT GENERATOR (E.G. BOILER, HOT AIR GENERATOR, FURNACE, ETC.), ANY OTHER USE IS TO BE CONSI-
DERED IMPROPER AND THEREFORE DANGEROUS.
THE USER MUST GUARANTEE THE CORRECT FITTING OF THE APPLIANCE, ENTRUSTING THE INSTALLATION OF IT TO
QUALIFIED PERSONNEL AND HAVING THE FIRST COMMISSIONING OF IT CARRIED OUT BY A SERVICE CENTRE AUTHORI-
SED BY THE COMPANY MANUFACTURING THE BURNER.
A FUNDAMENTAL FACTOR IN THIS RESPECT IS THE ELECTRICAL CONNECTION TO THE GENERATOR’S CONTROL AND
SAFETY UNITS (CONTROL THERMOSTAT, SAFETY, ETC.) WHICH GUARANTEES CORRECT AND SAFE FUNCTIONING OF
THE BURNER.
THEREFORE, ANY OPERATION OF THE APPLIANCE MUST BE PREVENTED WHICH DEPARTS FROM THE INSTALLATION
OPERATIONS OR WHICH HAPPENS AFTER TOTAL OR PARTIAL TAMPERING WITH THESE (E.G. DISCONNECTION, EVEN
PARTIAL, OF THE ELECTRICAL LEADS, OPENING THE GENERATOR DOOR, DISMANTLING OF PART OF THE BURNER).
NEVER OPEN OR DISMANTLE ANY COMPONENT OF THE MACHINE.
OPERATE ONLY THE MAIN SWITCH, WHICH THROUGH ITS EASY ACCESSIBILITY AND RAPIDITY OF OPERATION ALSO
FUNCTIONS AS AN EMERGENCY SWITCH, AND ON THE RESET BUTTON.
IN CASE OF A BURNER SHUT-DOWN, RESET THE CONTROL BOX BY MEANS OF THE RESET PUSHBUTTON. IF A SECOND
SHUT-DOWN TAKES PLACE, CALL THE TECHNICAL SERVICE, WITHOUT TRYING TO RESET FURTHER.
WARNING: DURING NORMAL OPERATION THE PARTS OF THE BURNER NEAREST TO THE GENERATOR (COUPLING
FLANGE) CAN BECOME VERY HOT, AVOID TOUCHING THEM SO AS NOT TO GET BURNT.
OPERATION
1
Set to the ON position the switch A on the control panel of the burner.
2
Check the control box is not in the lockout position (light
B
must be off); in such a case reset it by the reset pushbutton
C
.
3
Check the series of thermostats (or pressure switches) sends the burner the signal to operate.
4
The startup sequence begins: the control box ignites the fan motor and energises the ignition transformer as well (signalled by the
light
H
on the burner control panel).
5
At the end of the pre-purge stage, the light oil solenoid valve EVG1 is energised (signalled by the lamp
G
on the control panel) and
the burner is on.
6
The ignition transformer is energized for few seconds after the ignition of the flame (post-ignition time) and at the end of this time is
de-energised (light
H
off).
7
After the ignition the servocontrol moves to the high flame position for some seconds, then the operation begins and the burner
switches to high flame or to low flame, according to the plant demand.
8
The high/low flame operation is showed by the
F
LED turning on/off.
ATTENTION:
before starting the burner up, be sure that the manual cutoff valves are open and check that the
mains switch is closed.
PART II: OPERATION
Содержание PG70
Страница 32: ...PG60 G PR...
Страница 33: ......
Страница 34: ......
Страница 35: ......
Страница 36: ...PG60 G MD...
Страница 37: ......
Страница 38: ......
Страница 39: ......
Страница 40: ......
Страница 41: ...PG70 PG81 G PR...
Страница 42: ......
Страница 43: ......
Страница 44: ......
Страница 45: ...PG70 PG81 G MD...
Страница 46: ......
Страница 47: ......
Страница 48: ......
Страница 49: ......
Страница 53: ......
Страница 54: ......
Страница 55: ......
Страница 56: ......