FOODBOX TOUCH, FOODBOX LONG TOUCH, FOODBOX LIFT TOUCH
Page 14
Version 1.3 / December 2018
5.2 Safety precautions
When transporting the vending machine to the installation location use mechanical or automatic fork
loader.
-the vending machine should be transported in a vertical position on its own base;
-it’s forbidden to drop and overturn the vending machine;
-it’s forbidden to use ropes, strands, cables, etc. for the vending machine movement;
-before moving the vending machine make sure that the power cord is disconnected from the mains;
-after transportation of the vending machine for long distances at which it was exposed to high level
of vibration or impacts, check the contact connections between the elements and functional nodes, as well
as the mounting of the elements and functional nodes.
5.3 Installation
Remove the shipping package and packaging material from the vending machine. Contact the
supplier if the vending machine has any visible damaged:
-before the first activation, hold the vending machine in the premise at room temperature for at least
5 hours. Make sure there’s no condensate on the vending machine internal elements and, in particular, on
the touch screen and door;
-carefully move the vending machine by using the fork loader to the placement location and lift it for
20...30 cm;
-secure the loader;
-by using a S=10 mm spanner unscrew the fastening bolts and remove the wooden supports. It’s
recommended to put bolts with washers and wooden supports into a plastic bag together with packaging
for storage;
-take four supporting feet, packed for the duration of transportation into the product dispensing tray,
unpack them and screw into the holes in the vending machine base corners;
-lower the vending machine to the placement location and remove the forklift from under the ma-
chine;
-by using a S=34 mm spanner adjust the supporting feet, so that the vending machine is level in a
horizontal plane;
-use a level for ensuring the level installation;
-after the vending machine installation and levelling take the ventilation cover, packed for the dura-
tion of transportation into the product dispensing tray, and install it on the vending machine by using the
screws from the fitting kit (fig. 6).
figure 6- Installation of ventilation cover