21
Tec
hnical f
eatures and dimensions
1
2
3
4
Install the body insulation by making a suitable cut where
the top flow fitting is.
- Wrap the plastic strap around the mineral wool insulation
and insert one of its ends in the locking slot as shown in
detail 1.
- Holding the end of the strap already inserted, proceed
with the other end by folding the plastic pin inward as
shown in detail 2.
- Pull the two ends of the strap (as shown in details 3 and
4) until the strap adheres to all the mineral wool covering
the boiler body.
It is recommended not to overstretch the strap; ex-
cessive crushing of the mineral wool would cause
inconsistent insulation.
In case of maintenance it is possible to remove the strap
by acting on the locking slots.
Insulation and
casing assembly
- Detail “A”: assemble the knob pos. 4
on the top door closing handle.
Mount the screw and nut on the top
door and screw the knob on (pos. 1,
2, 3).
- Detail “B”: assemble the air header
pos. 2.
Primary and secondary air draught
adjustment is described on page 30.
- Detail “C”: assemble the screw and
nut on the bottom door and screw the
knob on (pos. 1, 2, 3).
- Detail “E”: assemble the smoke cham-
ber inspection doors.
- Attach the flame control mirror (pos. 6)
to the sight glass on the bottom door.
- Install the body insulation by making a
suitable cut where the top flow fitting
is.
Fasten the micro-switch to the inside of the front plate and
adjust the axis of the thrust washer so that it is controlled
every time the top wood loading door is closed.
Содержание NOVAIREX 35
Страница 1: ...INSTALLATION AND MAINTENANCE INSTRUCTIONS NOVAIREX 35 45 55 ...
Страница 55: ......