background image

30         SERVICE INSTRUCTIONS 

   

1. VERSION GB 

SWITCHING OVER TO ANYOTHER TYPE OF 
GAS  

During  the  course  of  their  production,  the  boilers  are 

produced and calibrated for G20 type natural gas.  

Switching  the  devices  to  another  type  of  gas  and 
carrying  out  its  gas  technical  calibration  can  only  be 

carried out by the brand service! 

Switching  over  to  another  type  of  gas  –  e.g.  G30 
(propane) – involves the following: 

Replacing the nozzles 

o

  Take off the door of the boiler  

o

  Screw  the  nozzles  out  of  the  collector  and  in 

their place screw in the nozzles of the right size 
for the gas type. Use the washers! 

Gas technical calibration  

o

  Connect  the  pressure  gauge  on  the  measuring 

stub (A). 

o

  Start the boiler in the manner introduced earlier.

o

  Remove  closing  valve  number  1  of  the  gas 

valve.

o

  With the help of bolt number 2, set the pressure 

value to the value specified in the table (the bolt

under the closing bolt). By turning the bolt to the

right,  pressure  increases,  by  turning  it  into  the 

opposite direction, it decreases.

o

  Remove the measuring device and put back the 

closing bolts.

When switching the gas device to another gas type, the 

size of the nozzle and the value of the gas pressure are 

to  be  the  same  as  the  values  specified  in  the  table
introduced above! 

o

  Before  and  during  calibration,  check  the 

pressure of the tanked gas system. 

o

  Check the density of the complete pipe system. 

o

  Remove  the  label  “Calibrated  for  G20”  stuck 

under  the  gas  connection,  and  instead  post  a 

label referring to the current gas type. 

Содержание GHISS 16R AP

Страница 1: ...4 32 R AP PV GHISS 16 24 32 R AE PV GHISS 16 24 32 40 B AP GHISS 16 24 32 40 B AE GHISS 16 24 32 B AP PV GHISS 16 24 32 B AE PV USER S MANUAL AND OPERATING INSTRUCTIONS STANDARD GAS DEVICE WITH CAST I...

Страница 2: ...ation we presented on the following pages carefully and keep it because you will need it later too If you take our advice our product will serve you reliably for long years to come TABLE OF CONTENTS G...

Страница 3: ...year The present operating instructions contains all the important information in connection with the use of the device for the user therefore it is practical to keep it close to the boiler If the de...

Страница 4: ...ump on building heating side automatic de airing valve closed expansion tank and safety blow off valve or the version without those made for already existing heating systems Its hot water container ha...

Страница 5: ...d pipe 12 Gas pipe 13 Gas valve 14 Ignition controller only on AE type 15 Ignition electrode 16 Nozzle holding collector 17 Pressure meter 18 Draining tap 19 Expansion tank 20 Filling tap 21 100 l tan...

Страница 6: ...sure mbar 25 Burner nozzle pressure H mbar 12 8 12 5 11 6 12 11 5 11 5 Burner nozzle pressure S mbar 14 5 13 5 12 5 13 12 5 13 Burner nozzle diameter H mm 2 35 2 35 2 35 2 35 2 45 2 45 Burner nozzle d...

Страница 7: ...water pressure bar 6 6 6 6 Container test overpressure bar 10 10 10 10 Gas technical data Classification according to gas used II2H S3B P Piped natural gas Connecting gas pressure mbar 25 Burner nozz...

Страница 8: ...S R AE PV type devices Legends 1 Forward 2 Return 3 Gas 4 Network water 5 Draining 6 Filling up 7 Hot water for use 8 Circulation 9 Hot water for use drainage 10 Boiler thermostat 11 Restricting therm...

Страница 9: ...save electric energy The pressure loss of PV type boilers Upon the first start up of the boiler and after a longer shut down it is practical to check the turnability of the axle of the pump with the...

Страница 10: ...t F B T Smoke gas safety thermostat F T Fixed thermostat SZ T Room thermostat N Neutral conductor F SZ Heating circulation pump L Phase conductor L J Indicator lamp flame indicator PE Protective groun...

Страница 11: ...ke gas safety thermostat F T Fixed thermostat SZ T Room thermostat N Neutral conductor F SZ Heating circulation pump L Phase conductor L J Indicator lamp flame indicator PE Protective grounding 1L Gas...

Страница 12: ...meter 2 Smoke gas restricting thermostat 3 Temperature restricting thermostat 4 Main switch 5 Winter Summer switch 6 Mode of operation indicator lamp 7 Error indicator lamp 8 Reset button lighted 9 Bo...

Страница 13: ...lot light burner by pressing the piezo ignition 2 3 times then release the button after 15 20 seconds If switching on is unsuccessful it is to be repeated in 2 minutes required for the short ventilati...

Страница 14: ...Set the boiler regulating thermostat 9 according to the desired temperature Set the mode of operation switch 5 according to the desired mode of operation and turn it on Winter mode of operation heatin...

Страница 15: ...hen turn on again the exterior separator switch of the boiler o Check the setting of the room thermostat and carry out on it a switching on and a switching off o Check the setting of the boiler temper...

Страница 16: ...or the room thermostat goes off o In the event of an ignition error the illuminated reset button is lit in red AE o The procedure of re starting is the following press the reset button wait until the...

Страница 17: ...t at minimum o Set the room thermostat at 10 C SHUTTING DOWN FOR A LONGER PERIOD OF TIME In this case the following is to be done o Turn off the main switch of the boiler the green light goes off o Tu...

Страница 18: ...carefully and abide by the advice and instructions described The external deflector belonging to the GHISS R 48 and 56 devices are attached in a separate box SIZES AND WEIGHT GHISS 16 24 32 40 R GHISS...

Страница 19: ...AP GHISS B AE GHISS B AP PV GHISS B AE PV Type GHISS 16 B GHISS 16 B PV GHISS 24 B GHISS 24 B PV GHISS 32 B GHISS 32 B PV GHISS 40 B A 635 635 635 635 mm B 317 5 317 5 317 5 317 5 mm C 130 130 130 15...

Страница 20: ...of the fuel specified for the boiler according to the standards o The closed expansion tank of the system should be of the necessary size and pre tensioning pressure so it can compensate the changes...

Страница 21: ...S B AP PV GHISS B AE PV GHISS B 16 GHISS B16 PV GHISS B 24 GHISS B24 PV GHISS B 32 GHISS B32 PV GHISS B 40 1 forward 1 2 return 1 3 gas 4 cold water for use 5 hot water for use 6 circulation A 240 315...

Страница 22: ...e located within the appliance box Access can be achieved in the following way o Lift off the top of the boiler which is fixed by snaps o Screw out the screws of the top of the appliance box now you h...

Страница 23: ...d for and what is at disposal upon connection o Check the cleanness of the gas pipe and if necessary install a filter in front of the boiler The gas connection must ensure gas of the appropriate quant...

Страница 24: ...ND DRAINING THE SYSTEM With the GHISS R AP and GHISS R AE type devices the filling up of the system can be executed through the filling up draining tap on the boiler With the GHISS R AP PV and GHISS R...

Страница 25: ...with the GHISS B type the boiler performs only the production of hot water for use while in the case of the GHISS R type if the indirect container and the necessary electronic unit are connected In o...

Страница 26: ...ppen that during continuous operation the boiler stops and the error indicator lamp lights up For re establishment do the following o Take off the door of the boiler fastened by snaps o There are two...

Страница 27: ...g it on and off o The operation of the boiler thermostat by turning it off and on o The operation of the room thermostat by turning it off and on o The operation of the pump o The operation of the ext...

Страница 28: ...drain the water from the heating and the hot water for use systems MAINTENANCE Based on the standards and regulations gas devices require regular maintenance and periodical check ups This increases th...

Страница 29: ...17 25 9 17 17 37 14 17 29 5 14 17 29 5 14 17 29 5 Number of nozzles pcs 2 3 4 5 6 7 Nozzle size mm 2 35 1 45 1 45 2 35 1 45 1 45 2 35 1 6 1 6 2 35 1 6 1 6 2 45 1 6 1 6 2 45 1 6 1 6 Nozzle pressure mb...

Страница 30: ...measuring stub A o Start the boiler in the manner introduced earlier o Remove closing valve number 1 of the gas valve o With the help of bolt number 2 set the pressure value to the value specified in...

Страница 31: ...ned and the inside surface of the cast heat exchanger becomes accessible o Check the cleanness of the surfaces of the heat exchanger and clean it if soot settlement is visible If the layer of soil is...

Страница 32: ...the condition of the anode rod and the washer ring if need be replace 9 Check the condition of the boiler filling up pipe manually clean it mechanically during the course of self feed rinsing 3 Remov...

Страница 33: ...33 SERVICE INSTRUCTIONS 1 VERSION GB...

Отзывы: