24 THE INSTALLATION OF THE DEVICE
1. VERZIÓ RU
After the connection of the deflector to the boiler,
connection to the chimney is to be prepared the same
way as with the interior deflector types.
In case of an exterior deflector, the sensor of the smoke
gas restricting thermostat is to be placed in the deflector,
in the manner indicated in the graph. The sensor has to
be put into the bore hole on the internal brace of the
deflector as far as it goes, and must be secured against
slipping out by tightening the eccentric fastener.
The provision of air necessary for the operation of the
boiler is to be secured through the doors and windows
on the walls of the room or with the help of vent-holes!
FILLING UP AND DRAINING THE SYSTEM
With the GHISS R AP and GHISS R AE type devices,
the filling up of the system can be executed through the
filling up – draining tap on the boiler.
With the GHISS R AP PV and GHISS R AE PV types, if
the device has been connected to the water system,
filling up can be performed through the filling up tap
located on the device, or through the filling up – draining
tap.
With the GHISS B type devices, filling up is possible
from the CHW container, by opening the built-in filling up
tap.
Filling up can also be performed with the pipe-
connection attached to the return of the heating system.
Before you start filling up, the following is to be executed:
o
Turn off the main switch of the boiler.
o
Open the filling tap as far as the pressure of the
system reaches 1.5 bar.
o
Close the filling tap.
o
Turn on the boiler.
Draining:
o
Before you start draining, turn off the boiler.
o
Open the draining tap.
Содержание GHISS 16R AP
Страница 33: ...33 SERVICE INSTRUCTIONS 1 VERSION GB...