23         THE INSTALLATION OF THE DEVICE 

   

1. VERZIÓ  RU 

  The  following  rules  must  be  abided  by  upon  the 

execution of the electric connections: 

1. 

Connect  the  mains  cable  in  a  polarity-correct  way 

to  the  electric  mains.  The  maximum  length  of  this 
can be 3 m. 

2. 

The  markings  upon  connection:  L  –  phase 

conductor, N – neutral conductor. 

3. 

The recommended cross-section of the connecting 

cables is 1.5 mm

2

, and it is to be damage-free hose 

conductor.  

4. 

Connection  is  to  be  performed  according  to  the 
electric switching diagram. 

5. 

The  connection  of  a  protective  conductor  is 

obligatory. 

   Gas and water pipes must not be used for the    

         protective wire! The boiler and the pipe system   

         are to be connected with the shock-proofing  

         system with a standard protective conductor.  
         The manufacturer undertakes no responsibility  

         for incorrect execution! 

GAS CONNECTION 

The  device  can  be  connected  either  to  a  piped  natural 
gas or tanked gas (LPG) system.  

Before you execute the connection, the following is to be 
performed: 

o

  Check what gas type the boiler has been regulated 

for and what is at disposal upon connection. 

o

  Check  the  cleanness  of  the  gas  pipe  and  if 

necessary, install a filter in front of the boiler.

  The  gas  connection  must  ensure  gas  of  the 

appropriate  quantity  and  pressure,  and  the 

appropriate  operation  of  the  measuring  and  safety 
system must be checked. 

  After  you  have  connected  the  device  to  the  gas 

system,  check  whether  the  seal  is  intact  and 

whether the standards have been abided by. 

The gas pipe connection size of every GHISS device 
type is ¾”. 

 CONDUCTING COMBUSTION PRODUCTS  

Connect the boiler to the chimney according to the valid 

standards and requirements.   

Connection is to be executed with rigid pipes, providing 

for appropriate caulking, also counting on the 
condensing water that may be produced. The 

mechanical attachment of connecting pipes should be
secured against movement and slipping out. 

  The boilers are equipped with smoke gas restricting 

thermostat,  which,  in  case  smoke  gas  flows  back, 

close  down  the  operation  of  the  boiler  in  an 
interlocked manner  

  The  use  of  un-insulated  external  chimney  poses 

potential dangers. 

The  connection  of  GHISS  16,  -24,  -32,  -40  ..  ..  type 

devices to the chimney. 

GHISS 48, -56 .. .. type devices are to be connected to 

the chimney with an external deflector. 

Содержание GHISS 16R AP

Страница 1: ...4 32 R AP PV GHISS 16 24 32 R AE PV GHISS 16 24 32 40 B AP GHISS 16 24 32 40 B AE GHISS 16 24 32 B AP PV GHISS 16 24 32 B AE PV USER S MANUAL AND OPERATING INSTRUCTIONS STANDARD GAS DEVICE WITH CAST I...

Страница 2: ...ation we presented on the following pages carefully and keep it because you will need it later too If you take our advice our product will serve you reliably for long years to come TABLE OF CONTENTS G...

Страница 3: ...year The present operating instructions contains all the important information in connection with the use of the device for the user therefore it is practical to keep it close to the boiler If the de...

Страница 4: ...ump on building heating side automatic de airing valve closed expansion tank and safety blow off valve or the version without those made for already existing heating systems Its hot water container ha...

Страница 5: ...d pipe 12 Gas pipe 13 Gas valve 14 Ignition controller only on AE type 15 Ignition electrode 16 Nozzle holding collector 17 Pressure meter 18 Draining tap 19 Expansion tank 20 Filling tap 21 100 l tan...

Страница 6: ...sure mbar 25 Burner nozzle pressure H mbar 12 8 12 5 11 6 12 11 5 11 5 Burner nozzle pressure S mbar 14 5 13 5 12 5 13 12 5 13 Burner nozzle diameter H mm 2 35 2 35 2 35 2 35 2 45 2 45 Burner nozzle d...

Страница 7: ...water pressure bar 6 6 6 6 Container test overpressure bar 10 10 10 10 Gas technical data Classification according to gas used II2H S3B P Piped natural gas Connecting gas pressure mbar 25 Burner nozz...

Страница 8: ...S R AE PV type devices Legends 1 Forward 2 Return 3 Gas 4 Network water 5 Draining 6 Filling up 7 Hot water for use 8 Circulation 9 Hot water for use drainage 10 Boiler thermostat 11 Restricting therm...

Страница 9: ...save electric energy The pressure loss of PV type boilers Upon the first start up of the boiler and after a longer shut down it is practical to check the turnability of the axle of the pump with the...

Страница 10: ...t F B T Smoke gas safety thermostat F T Fixed thermostat SZ T Room thermostat N Neutral conductor F SZ Heating circulation pump L Phase conductor L J Indicator lamp flame indicator PE Protective groun...

Страница 11: ...ke gas safety thermostat F T Fixed thermostat SZ T Room thermostat N Neutral conductor F SZ Heating circulation pump L Phase conductor L J Indicator lamp flame indicator PE Protective grounding 1L Gas...

Страница 12: ...meter 2 Smoke gas restricting thermostat 3 Temperature restricting thermostat 4 Main switch 5 Winter Summer switch 6 Mode of operation indicator lamp 7 Error indicator lamp 8 Reset button lighted 9 Bo...

Страница 13: ...lot light burner by pressing the piezo ignition 2 3 times then release the button after 15 20 seconds If switching on is unsuccessful it is to be repeated in 2 minutes required for the short ventilati...

Страница 14: ...Set the boiler regulating thermostat 9 according to the desired temperature Set the mode of operation switch 5 according to the desired mode of operation and turn it on Winter mode of operation heatin...

Страница 15: ...hen turn on again the exterior separator switch of the boiler o Check the setting of the room thermostat and carry out on it a switching on and a switching off o Check the setting of the boiler temper...

Страница 16: ...or the room thermostat goes off o In the event of an ignition error the illuminated reset button is lit in red AE o The procedure of re starting is the following press the reset button wait until the...

Страница 17: ...t at minimum o Set the room thermostat at 10 C SHUTTING DOWN FOR A LONGER PERIOD OF TIME In this case the following is to be done o Turn off the main switch of the boiler the green light goes off o Tu...

Страница 18: ...carefully and abide by the advice and instructions described The external deflector belonging to the GHISS R 48 and 56 devices are attached in a separate box SIZES AND WEIGHT GHISS 16 24 32 40 R GHISS...

Страница 19: ...AP GHISS B AE GHISS B AP PV GHISS B AE PV Type GHISS 16 B GHISS 16 B PV GHISS 24 B GHISS 24 B PV GHISS 32 B GHISS 32 B PV GHISS 40 B A 635 635 635 635 mm B 317 5 317 5 317 5 317 5 mm C 130 130 130 15...

Страница 20: ...of the fuel specified for the boiler according to the standards o The closed expansion tank of the system should be of the necessary size and pre tensioning pressure so it can compensate the changes...

Страница 21: ...S B AP PV GHISS B AE PV GHISS B 16 GHISS B16 PV GHISS B 24 GHISS B24 PV GHISS B 32 GHISS B32 PV GHISS B 40 1 forward 1 2 return 1 3 gas 4 cold water for use 5 hot water for use 6 circulation A 240 315...

Страница 22: ...e located within the appliance box Access can be achieved in the following way o Lift off the top of the boiler which is fixed by snaps o Screw out the screws of the top of the appliance box now you h...

Страница 23: ...d for and what is at disposal upon connection o Check the cleanness of the gas pipe and if necessary install a filter in front of the boiler The gas connection must ensure gas of the appropriate quant...

Страница 24: ...ND DRAINING THE SYSTEM With the GHISS R AP and GHISS R AE type devices the filling up of the system can be executed through the filling up draining tap on the boiler With the GHISS R AP PV and GHISS R...

Страница 25: ...with the GHISS B type the boiler performs only the production of hot water for use while in the case of the GHISS R type if the indirect container and the necessary electronic unit are connected In o...

Страница 26: ...ppen that during continuous operation the boiler stops and the error indicator lamp lights up For re establishment do the following o Take off the door of the boiler fastened by snaps o There are two...

Страница 27: ...g it on and off o The operation of the boiler thermostat by turning it off and on o The operation of the room thermostat by turning it off and on o The operation of the pump o The operation of the ext...

Страница 28: ...drain the water from the heating and the hot water for use systems MAINTENANCE Based on the standards and regulations gas devices require regular maintenance and periodical check ups This increases th...

Страница 29: ...17 25 9 17 17 37 14 17 29 5 14 17 29 5 14 17 29 5 Number of nozzles pcs 2 3 4 5 6 7 Nozzle size mm 2 35 1 45 1 45 2 35 1 45 1 45 2 35 1 6 1 6 2 35 1 6 1 6 2 45 1 6 1 6 2 45 1 6 1 6 Nozzle pressure mb...

Страница 30: ...measuring stub A o Start the boiler in the manner introduced earlier o Remove closing valve number 1 of the gas valve o With the help of bolt number 2 set the pressure value to the value specified in...

Страница 31: ...ned and the inside surface of the cast heat exchanger becomes accessible o Check the cleanness of the surfaces of the heat exchanger and clean it if soot settlement is visible If the layer of soil is...

Страница 32: ...the condition of the anode rod and the washer ring if need be replace 9 Check the condition of the boiler filling up pipe manually clean it mechanically during the course of self feed rinsing 3 Remov...

Страница 33: ...33 SERVICE INSTRUCTIONS 1 VERSION GB...

Отзывы: