background image

24

E

E

E

E

L1

T2

N

S3

T1

B4

IG

11

41

32

32

12

13

31

230V~ 50Hz

2

1

3

4

4-4

24

14

C

2

1

22

12

21

11

C

2

G-V

6-6

7-7

8-8

9-9

10-10

Ts

7

14

15 16

6

9

5

8

10

B

A

20

21

24

Pi

18

17

23

22

19

11

12

Ipi

Ib

(50°C)

(60°÷90°C)

(54°÷84°C)

(100°C)

Tm

Te1

F1 (max 4 A)

Te2

13

C

N

Ph

B5

T6

T7

T8

1 stage burner plug

st

2   stage burner plug (optional)

nd

3.1 - PANEL BOARD TYPE

21057 - FUNCTIONS
DESCRIPTION

Through the main switch  11  the panel board
and all the equipments connected to it will be
under power.
The switches  12   &  13  switch On and  OFF
the power to the burner and the Heating pump
(via a relay, if necessary).
With the thermostat  32  the working
temperature of the boiler can be adjusted.
This thermostat is provided with a DPDT
contact, for the control of a two stage burner.
The differential between the switching points of
the two double pole is 6°C (not adjustable).
The minimum thermostat, accessible through the
opening of the panel board cover, switches
OFF the C.H. pump during the reacing of the
steady state and up to the obtention of 50 °C
within the boiler.
On the electrical supply line to the boiler a
switch with fuses is to be forseen.

3

STANDARD PANEL BOARD

fig. 30

3.2 - ELECTRICAL WIRING DIAGRAM FOR SINGLE PHASE BURNER AND PUMP

Te1  1

st

 stage working thermostat (60°C÷90°C)

Te2  2

nd

 stage working thermostat (54°C÷84°C)

Tm Minimum thermostat (50°C)
Ts High limit thermostat (100°C)
Pi C.H. pump
A Burner lockout warning lamp (eventual)

Ph Phase (230V ~50Hz)
N Neutral
F1 General fuse (max 4A)
Ib Burner switch
IG Illuminated main switch
Ipi C.H. pump switch

fig. 31

11 Illuminated main switch
12 Burner switch
13 C.H. pump switch
31 High limit thermostat

32 Working thermostat
41 General fuse
42 Thermometer

B

Hourmeter for 1

st

 stage operation

C Hourmeter for 2

nd

 stage operation

Содержание ELLPREX Series

Страница 1: ...26739 01 13 rev 4 ELLPREX INSTALLATION USE AND SERVICING INSTRUCTION to be kept by the user...

Страница 2: ...boiler house the safety devices the chimney the fuel supply lines the electrical installations and all the other local requirements and safety instructions Approvals The UNICAL boilers ELLPREX range h...

Страница 3: ...ter systems BS 5546 Installation of gas hot water supplies for domestic purposes 2nd Family Gases BS 6644 Ventilation for gas appliances of rated input exceeding 60 kW HEALTH SAFETY DOCUMENT No 635 Th...

Страница 4: ...2 7 3 Burner installation page 15 2 8 Connection of the sight glass to the burner via a cooling line page 16 2 9 Casing assembly page 16 STANDARD PANEL BOARD page 24 3 1 Panel board type 21057 functio...

Страница 5: ...by a textile in mineral fiber For models from ELL 4500 to ELL 7000 the outer shell is insulated with a felt lamellar matress thick 50 mm protected by an alumi fig 1 1 2 WORKING PRINCIPLE The ELLPREX b...

Страница 6: ...190 251 264 298 398 462 565 Water side pressure loss m w c 0 09 0 15 0 19 0 33 0 12 0 21 0 16 0 28 0 09 0 17 0 14 0 25 0 21 0 38 9 15 15 28 13 25 17 34 16 29 24 43 32 55 Smoke side pressure loss mm w...

Страница 7: ...1122 1122 B mm 1605 1800 1995 1432 1432 1432 C mm 190 190 190 D mm 195 195 195 E mm F mm 190 190 190 G mm 765 765 765 H mm 480 480 480 1989 2184 2379 L mm 125 125 125 1540 1540 1540 M mm 298 298 298 N...

Страница 8: ...H mm 595 595 640 640 690 690 2346 2686 2781 3151 3225 3545 L mm 180 180 75 75 75 75 1540 1540 1650 1650 1810 1810 M mm 461 461 561 561 661 662 N mm 330 670 510 880 670 990 O mm 500 500 550 550 700 700...

Страница 9: ...G mm 1315 1535 1535 H mm 772 915 915 3835 3879 4279 L mm 115 144 144 1990 2271 2271 M mm 325 377 777 N mm 1100 1060 1060 O mm 1330 1280 1420 P mm 1620 1870 1870 Q mm 3200 3164 3564 R mm Nominal Outpu...

Страница 10: ...00 3800 5000 4180 5500 4560 6000 4940 6500 5320 7000 3638 3 4838 7 4064 2 5421 8 4446 8 5914 4877 6506 2 5255 3 6989 2 5689 8 7590 5 6012 6012 7058 7058 7909 7909 0 70 0 85 0 80 1 05 0 95 1 15 1 00 1...

Страница 11: ...ion is highly recommended To allow the cleaning of the smoke pipes in front of the boiler a clearance equal to the length of the boiler has to be available With the boiler door opened at 90 the distan...

Страница 12: ...the entity of the reinstatement water to avoid inconvenients due to untreated water For that reason it is suggested to fit in the feeding line to the boiler a water meter for small capacities 2 5 2 C...

Страница 13: ...le A Adjustment in vertical way it is possible only by introducing some washers of convenient thickness under the hinge on which the door rotates fig 17 B Adjustment in transversal way it is possible...

Страница 14: ...L H side are normally used as rotating hinges from Right to Left whilst the two ones on the R H side are used as closing hinges Exactly the contrary will happen when the door is hinged on the R H side...

Страница 15: ...0 970 270 270 ELLPREX 290 630 220 250 ELLPREX 170 240 180 250 2 7 1 CONFORMITY OFTHE BURNER All the burners equipping the ELLPREX boilers must be CE certificated and must conform to the following dire...

Страница 16: ...REX 1850 30001 casing upper part ELLPREX 1850 30002 casing front part ELLPREX 2200 30003 casing rear part ELLPREX 2200 30004 casing upper part ELLPREX 2200 30002 casing front part ELLPREX 2650 30081 c...

Страница 17: ...ion B Locate the side panels 3 and 4 with the lower bend inside the bottom L profiles and the upper bend in the seats of front and rear tube plates To determine which is the left and right panel ensur...

Страница 18: ...ht panel ensure that the cable clamp plates are positioned facing toward the front edge Fit the four flathead screws 8 on the inner bend of the rear side panels 3b 4b C Open the combustion chamber doo...

Страница 19: ...nd to the upper L profile To determine which is the left and right panel ensure that the cable clamp plates 5 are positioned facing toward the front edge C Open the combustion chamber door and fit the...

Страница 20: ...e side panels 3a 3b 3c and 4a 4b 4c with the lower bend inside the bottom L profiles and hooking the upper bend to the upper L profile To determine which one of the front side panels is the left or th...

Страница 21: ...les and hook them to the screws fitted to the upper square tube To determine which one of the front side panels is the left or the right ensure that the cable clamp plates 5 are positioned facing towa...

Страница 22: ...thermostat 3 minimum thermostat 4 We recommend that the introduction of the sensors is made up to bottom of the bulb holder s To get a better contact introduce also the arcuated spring 6 and secure th...

Страница 23: ...of the two side screws from the panel board rotate its cover towards the front and insert the cables and the capillaries of thermometer and thermostats through the slots on its base Insert the capill...

Страница 24: ...een the switching points of the two double pole is 6 C not adjustable Theminimumthermostat accessiblethrough the opening of the panel board cover switches OFF the C H pump during the reacing of the st...

Страница 25: ...er and flow are included in the supply the room sensors for the C H systems No 1 and No 2 are optionals The mixing valve and the relevant motor are not supplied by Unical When the room sensor is not f...

Страница 26: ...G V 6 6 7 7 8 8 9 9 10 10 2nd stage Tm Minimum thermostat Ts High limit thermostat Vm2 Mixing valve for 2nd zone A Burner lockout warning lamp eventual B Hourmeter eventual 3 5 ELECTRICAL WIRING DIAGR...

Страница 27: ...08 RELAY FUNC 1 00 30 C 90 C RELAY TEMP 1 30 C 2K 10K HYST RELAY 1 5K 00 03 RELAY FUNC 2 00 00 01 OFF ON SCREED 00 OFF See explanation SCREED PROGR RETURN Default IV Value range Designation HOTWATER...

Страница 28: ...00 24 00 OUT TEMP DEL 1 0K 50K SLOPE OFFSET 5K 00 01 OFF ON B HEAT SINK 01 ON Exit level using RETURN Default IV Value range Designation HEATING CIRCUIT 1 00 04 HC FUNCTION 00 00 03 PUMP MODE 00 5 25...

Страница 29: ...ensor code no required after input there is a restart of the controller RETURN end of INSTALLATION Start INSTALLATION Set value Save value and next value Start INSTALLATION Set value Save value and ne...

Страница 30: ...02 OPTIMIZAT 00 0 00 3 00 h M OPT TIME 2 00 h 0 00 3 00 h ECONO OPTI 0 00 h 0000 9999 PC ENABLE 0000 Default IV Value range Designation HEATING CIRCUIT 2 MODE 5 C 40 C T ROOM DES 1 20 C 5 C 40 C T RO...

Страница 31: ...Mo Tu We TH Fr 06 00 to 22 00 Sa Su 07 00 to 23 00 Value range Designation HEAT CIRCUIT 2 HEAT PROGRAM 1 FACTORY SETTING Mo Tu We TH Fr 06 00 to 08 00 16 00 to 22 00 Sa Su 07 00 to 23 00 HEAT PROGRAM...

Страница 32: ...hydraulic schemas shown in the figs 35 36 are principle schemas in case of different system circuits contact please our after sale service dept which will supply you with all the necessary informatio...

Страница 33: ...ponsibility of a specialized and well trained burner technician authorised by the burner manufacturer In that occasion a commissioning report has to be filled out POSITION OF THE CORE INSIDE THE TURBU...

Страница 34: ...RSTCOMMISSIONING At the commissioning stage of the boiler a qualified technician has to perform the following checks Internal and external sound test of burner and fuel feeding pipe Adjustment of the...

Страница 35: ...0 position 5 1 GENERAL RULES Before effecting any operation of cleaning or maintenance disconnect the boiler from the electrical supply acting on the main switch onto the panel board In case of failur...

Страница 36: ...ty and control devices imposed by local requirements that cannot be attributed to the constructive geometry and or to the materials used and to the constructive technique and therefore they are not co...

Страница 37: ...37 Notes...

Страница 38: ...38 Notes...

Страница 39: ...39 Notes...

Страница 40: ...Unical AG declines any liability for the inaccuriaces that may appear due to errors in trascription or printing It also reserves the right to introduce those modifications to its products that it con...

Отзывы: