13
Instructions for the installer
3.3 - PACKAGING
The GASOGEN G3 2S is supplied dismantled: the casing, the
fan, the control panel, the handles and the cleaning accessories
are delivered separately in carton boxes
(fig. 8).
After having unpacked everything, make sure that
the consignment is intact and undamaged.
In case of doubt do not to use the appliance and
inform the supplier.
Keep the packaging material (cardboard box,
plastic bags, polyester protection etc
.) out of
the reach of children since they can be
dangerous.
UNICAL refuses all liability for injury to persons,
animals or damage to property deriving from
not having respected the above mentioned
recommendations.
Packages description:
1. Boiler body
2. Package containing the shell and boiler insulation
3. Package containing the instrument panel
4. Package containing the fume extraction fan
5. Package containing: manifold air inlet, inspection covers smoking chamber,
handles, mirror flame detector, various screws, cleaning accessories. This
package is shipped inside the wood storage
In the documents, placed in the fire box, you will find:
- User’s instruction guide
- Installation and servicing instruction manual
- Warranty
- Adhesive data plate
- Adhesive label with ventilation requirements
If the boiler will not be used for a long period,
it should be adequately protected.
fig. 8
3.4 - TRANSPORTATION
To facilitate the transport, the loading and unloading of the
boiler, on the upper part of the boiler body there are suitable
hooks (fig. 8) for lifting.
1
2
3
G
4
5
Содержание AIREX 25 2S
Страница 1: ...AIREX 2S INSTALLATION AND SERVICING MANUAL 00333938 1st edition 12 11 ...
Страница 38: ......
Страница 39: ......