13
3.
Use only certified ropes or chains or belts
4.
The machine must not be
hooked
directly
to the crane hook;
always use ropes, chains or
belts
5.
Keep ropes, chains or belts tight when lifting or rotating the machine, in order to prevent its
swinging, which can lead to an accident
6.
When lifting the machine with a crane, always check the lifting path and remove all
obstacles
7.
Always attach the machine thoroughly to transport it on a trailer, platform, etc.
8.
Ensure that the entire area, where the manoeuvres with the unit will be carried out
together with the place, where the vehicle will be positioned, has been previously checked
for possible ‘danger zones’, especially in terms of electric wires, gas or liquid lines, etc. If
there are such ‘danger zones’, choose another place for manoeuvres
9.
All personnel should maintain an adequate safety clearance so that, if the machine would fall
unexpectedly, its detached parts will not hit them
Caution!
The unit must be positioned stable on an even and hard surface after unloading.
6.2.
Connecting the Machine to the Tractor
For connecting the machine to the tractor, see Fig. 8-1
Safety instructions
Warning
Be extremely careful when connecting and disconnecting the machine
.
It is strictly forbidden to stay between the tractor and the hitch of the coupling at the moment of
connecting (approaching) and disconnecting (departure). Do not enter between the tractor and the
unit
when operating
the tractor linkage system.
Switch the tractor hydraulic system to position control.
-
Raise the tractor lifting arms so that the machine’s lower hitch bolts are in its axis
-
Drive the tractor so that the lower hitches (1) (see Fig. 8-1) of the unit could be inserted into
the tractor hitch and secured with bolts and linchpins. The bottom hitches of the unit are
adjusted by means of pins (3) extend the hitches so that there is no interference between the
unit and the tractor
Using the lifting and tilting arms on the tractor, position the machine so that it is in the
horizontal plane. Mark setting of the arms or install stops
-
Connect the upper point of the three-point system of the machine No. 2 to the
tractor with the turnbuckle
The point of connection of the top link on the cultivator unit should be positioned higher than
the point of connection of this link on the tractor
-
Fit the PTO drive shaft to the spline ends of the tractor and machine shafts; the outer tube of
the shaft sheath should be on the tractor side
-
Immobilize the shaft sheath against rotation with the chains
-
Check lifting and lowering of the unit