Une ZHERO Скачать руководство пользователя страница 6

 

 

 

 

UNE srl Via Modena, 48/E 42015 Correggio (RE) Italia 

Tel. +39 0522 693566 – [email protected] – https://unesrl.com

 

 

 

6

 

 

10.

 

OPERATION CHECK 

 

 

 

 

MONITORING SOFTWARE

 

 

Figure 6 - location of the USB port

 

 

 

To verify the correct functioning of ZHERO use the 

UneSrlCommunication

 software. 

The USB type B port for ZHERO monitoring is located in the upper left 

part, under the main panel, as indicated in the Figure 6. 

 

The UneSrlCommunication software and the relative instruction 

manual with le legend of each alarm 

"Manual - UneSrlCommunication"

 

can be downloaded from the site 

https: \\ unesrl.com in the 

"DOWNLOAD AREA".

 

 

 
The reading of the bits

 through UneSrlCommunication must be carried out from the bottom right to the left 

upwards.

 

DETAIL: STATUSCYCLE ALARMS

 

 

VERIFY

 

 

 

Figure 7 - Detail of machine states "STATUSCYCLE "

 

 

If only those bits are active, the system is working correctly: 

 

 

 

Agen0 - 

Bit 3

 will always be active (not relevant) 

 

Agen8 - 

bit 10

 will be active until the system has finished 

warmup; 

 

Agen8 - 

bit 15

 will be active if the irradiation sensor is absent; 

 

Agen16 - 

bit 18

 will always be active for machine status; 

 

Agen16 

-  bit 22

 could be active (not relevant).  

 

 

DETAIL: WATTMETRO COMMUNICATION

 

 

 

VERIFY

 

 

Figure 8 - Wattmeter led light indication

 

 

 

 

To check the communication between the wattmeter and UNE ZHERO: 

 

 

Check that the indicator light indicated in Figure 8 on the side is 

flashing intermittently. 

 

 

Содержание ZHERO

Страница 1: ...ZHERO QUICK INSTALLATION GUIDE Single phase series 3 0 UNE srl Via Modena 48 E 42015 Correggio RE Italia Tel 39 0522 693566 info unesrl com https unesrl com...

Страница 2: ...st be delivered signed to the customer at the end of all the procedures described 1 PLACEMENT OF A ZHERO In flat floor in easily accessible places in a position to ensure access to the switches in a p...

Страница 3: ...0 V or 200 600 V ATTENTION It is necessary to install a PV unloader SPD external to the machine with Up index Up 2 5 kV 4 AC CONNECTION A ZHERO TO MAINS DISTRIBUTOR GENERATOR and BACKUP Figure 2 ZHERO...

Страница 4: ...ct the output utilities from the wattmeter then downstream of the corresponding terminals 2 and N Figure 4 Wattmeter communication connection diagram 485 Wattmeter ZHERO communication connection Conne...

Страница 5: ...LG NG terminals has been disconnected for at least 30 seconds Move the BYPASS switch to position 1 Up to put the loads of the LC NC line under the backup line if the backup line is provided Enable the...

Страница 6: ...AD AREA The reading of the bits through UneSrlCommunication must be carried out from the bottom right to the left upwards DETAIL STATUSCYCLE ALARMS VERIFY Figure 7 Detail of machine states STATUSCYCLE...

Страница 7: ...alarm is all 0 DETAIL ALARM MPPT VERIFY Figura 10 Controller alarm details To check the communication of the controllers select the CONT0 CONT1 and CONT2 boxes depending on whether you have 1 2 or 3 c...

Страница 8: ...from the website https unesrl com in the section DOWNLOAD AREA Internet connection if the system is not online for more than 48 consecutive hours before opening a technical assistance ticket it is ne...

Отзывы: