Une ZHERO Скачать руководство пользователя страница 5

 

 

 

 

UNE srl Via Modena, 48/E 42015 Correggio (RE) Italia 

Tel. +39 0522 693566 – [email protected] – https://unesrl.com

 

 

 

5

 

 

7.

 

ZHERO ASSOCIATION WITH WEBSERVER

 

 

The installer will have to request, if not already registered with his own account, his registration directly to UNE email: 

[email protected]

 that will provide him with a username and password; by accessing the portal: 

https: \\ 

portal.zherosystem.com

 you can enter the code "WEB Activation: xxxxxx" which is located under the front cover, above the 

main fan and start monitoring the system. 

 

 

The end customer will have instead to register independently on the site: 

https: \\ portal.zherosystem.com

 and the 

association by entering the same code "WEB Activation: xxxxxx".

 

 

8.

 

CHECK CONNECTIONS 

 

Check mains voltage (230V) on terminals LG – NG but do not supply; 

 

Verify that the production counter is enabled; 

 

Check that the network is present on the wattmeter and the communication cable connected; 

 

Check the connection from the Internet cable to the “ETH” port; 

 

Check the tightening of the screws of any backup line from LC - NC; 

 

Verify that the photovoltaic system is enabled on entry to the system.  

 

9.

 

CONFIGURATION OF THE MAIN PANEL FOR THE FIRST STARTING 

                             SWITCH PANEL  

 

OPERATIONS 

 

Figure 5 - UNE ZHERO main panel

 

 

 

Check that the 230 V 

grid power supply

 on the LG - NG terminals 

has been disconnected for at least 30 seconds. 

 

Move the 

"BYPASS"

 switch to 

position 1

 (Up) to put the loads of 

the LC-NC line under the backup line (if the backup line is 

provided); 

 

Enable the 

"INV"

 circuit breaker; 

 

Enable all users downstream and upstream of the system 
(external to the system); 

 

Set the "

ON-OFF"

 switch to 

ON;

 

 

Set the 230V mains power supply on the LG - NG input terminals. 

CHECKS 

 

 

Verify that the System Main Light remains green. It is advisable, 

after about a week, to remotely check that all devices are 

communicating and that the system is perfectly in line with what 

is expected. (Photovoltaic production, battery charging and 

discharging, etc). 

 

 

Verify that the system turns on and begins to warm up the battery 

(this can take several minutes). 

 

 

IF THE MAIN LIGHT OF THE SYSTEM REMAINS RED, YOU WILL FIND THE 

POSSIBLE SOLUTIONS IN CHAPTER 10.

 

 

LEGEND

 

ISOL: 

Insulation control

 

ON-OFF: 

Disconnector, allows you to turn the system on or off. 

ALL: 

Alarm button, allows you to reset a system alarm that is signalled by the lighting of the red alarm lamp.

 

INV: 

Differential magnetothermic output from the inverter, it does not cause the interruption of the user but the blocking of the 

supply from the b photovoltaic source. 

BYPASS: 

Line diverter that allows you to bypass the "backup" line covered by the system. Upwards the system is covered by backup, 

in the central position the line is interrupted and downwards the line is directly connected to that of the distributor. 

 

 

Содержание ZHERO

Страница 1: ...ZHERO QUICK INSTALLATION GUIDE Single phase series 3 0 UNE srl Via Modena 48 E 42015 Correggio RE Italia Tel 39 0522 693566 info unesrl com https unesrl com...

Страница 2: ...st be delivered signed to the customer at the end of all the procedures described 1 PLACEMENT OF A ZHERO In flat floor in easily accessible places in a position to ensure access to the switches in a p...

Страница 3: ...0 V or 200 600 V ATTENTION It is necessary to install a PV unloader SPD external to the machine with Up index Up 2 5 kV 4 AC CONNECTION A ZHERO TO MAINS DISTRIBUTOR GENERATOR and BACKUP Figure 2 ZHERO...

Страница 4: ...ct the output utilities from the wattmeter then downstream of the corresponding terminals 2 and N Figure 4 Wattmeter communication connection diagram 485 Wattmeter ZHERO communication connection Conne...

Страница 5: ...LG NG terminals has been disconnected for at least 30 seconds Move the BYPASS switch to position 1 Up to put the loads of the LC NC line under the backup line if the backup line is provided Enable the...

Страница 6: ...AD AREA The reading of the bits through UneSrlCommunication must be carried out from the bottom right to the left upwards DETAIL STATUSCYCLE ALARMS VERIFY Figure 7 Detail of machine states STATUSCYCLE...

Страница 7: ...alarm is all 0 DETAIL ALARM MPPT VERIFY Figura 10 Controller alarm details To check the communication of the controllers select the CONT0 CONT1 and CONT2 boxes depending on whether you have 1 2 or 3 c...

Страница 8: ...from the website https unesrl com in the section DOWNLOAD AREA Internet connection if the system is not online for more than 48 consecutive hours before opening a technical assistance ticket it is ne...

Отзывы: