Une ZHERO Скачать руководство пользователя страница 4

 

 

 

 

UNE srl Via Modena, 48/E 42015 Correggio (RE) Italia 

Tel. +39 0522 693566 – [email protected] – https://unesrl.com

 

 

 

4

 

 

5.

 

CONNECTION OF THE WATTMETER AND UTILITIES (MANDATORY ON-GRID)

 

The connection cable of the wattmeter to the system must not exceed 50m in length.

  

ATTENTION:

 

the wattmeter is a single-phase 230V device with a maximum current of 100A.  

ATTENTION:

 

in the case of three-phase systems, each ZHERO system must have its own wattmeter.  

ATTENTION:

 

use twisted cables; do not use Cross cables. 

 

 

Figure 3 - Utilities and wattmeter connection diagram

 

 

Connection of AC to the wattmeter  

 

From the exchange counter, connect Phase and Neutral to terminals 1 

and N below it:  

 

 

Connect the direct line to ZHERO in the corresponding terminals 2 
and N below;  

 

Connect the output utilities from the wattmeter then downstream 

of the corresponding terminals 2 and N. 

 

 

 

Figure 4 Wattmeter communication connection diagram 

 
 

485 Wattmeter-ZHERO communication connection 

 

 

Connect an RJ-45 cable to the left RJ 45 input on the device as 
shown in the image; 

 

Connect the other end of the cable to the RJ-45 port on the ZHERO 

"WAT" panel; 

 

Make a jumper between terminal 3 and 5 of the wattmeter. 

 

 

 

6.

 

INTERNET CONNECTION 

 

Through Router 

 

Perform the following operations on the router: 

 

 

Set the router in DHCP; 

 

TCP and UDP ports opening: 9090 related to the IP address 

associated with the ZHERO by the router (in DHCP); 

 

Add the URL "HTTPS: \\ portal.zherosystem.com" to the 

navigation exclusions 

 

 

 

 

Before connecting, check that the cable connection is working. 

 

The  ethernet  cable  outgoing  from  the  ZHERO  system  must  be 

brought directly to the router or to a network switch connected to it 

as shown in the figures.

 

 

 

 

Through range-extender 

 

 

 

Содержание ZHERO

Страница 1: ...ZHERO QUICK INSTALLATION GUIDE Single phase series 3 0 UNE srl Via Modena 48 E 42015 Correggio RE Italia Tel 39 0522 693566 info unesrl com https unesrl com...

Страница 2: ...st be delivered signed to the customer at the end of all the procedures described 1 PLACEMENT OF A ZHERO In flat floor in easily accessible places in a position to ensure access to the switches in a p...

Страница 3: ...0 V or 200 600 V ATTENTION It is necessary to install a PV unloader SPD external to the machine with Up index Up 2 5 kV 4 AC CONNECTION A ZHERO TO MAINS DISTRIBUTOR GENERATOR and BACKUP Figure 2 ZHERO...

Страница 4: ...ct the output utilities from the wattmeter then downstream of the corresponding terminals 2 and N Figure 4 Wattmeter communication connection diagram 485 Wattmeter ZHERO communication connection Conne...

Страница 5: ...LG NG terminals has been disconnected for at least 30 seconds Move the BYPASS switch to position 1 Up to put the loads of the LC NC line under the backup line if the backup line is provided Enable the...

Страница 6: ...AD AREA The reading of the bits through UneSrlCommunication must be carried out from the bottom right to the left upwards DETAIL STATUSCYCLE ALARMS VERIFY Figure 7 Detail of machine states STATUSCYCLE...

Страница 7: ...alarm is all 0 DETAIL ALARM MPPT VERIFY Figura 10 Controller alarm details To check the communication of the controllers select the CONT0 CONT1 and CONT2 boxes depending on whether you have 1 2 or 3 c...

Страница 8: ...from the website https unesrl com in the section DOWNLOAD AREA Internet connection if the system is not online for more than 48 consecutive hours before opening a technical assistance ticket it is ne...