background image

 

 

Contents 

 

Pages with a shaded background are those which contain items related to safety. 

 

0

Before Using the Equipment ......................................................................................................... 01 

0.1

 

Checks When Opening Packaging ..................................................................................... 02 

0.2    Using the Pump Safety ....................................................................................................... 03 

  Safety symbols ....................................................................................................................... 03 

  Cautions for Safety in Use ...................................................................................................... 04 

 

1.  Product Outline ............................................................................................................................... 1 

1.1 Purpose of Use and Prohibitions .............................................................................................. 1 

1.2 Specifications ........................................................................................................................... 1 

1.3 Thermal Protector ..................................................................................................................... 2 

 

2.  Dimensions .................................................................................................................................... 2 

 

3.  Installation and Storage .................................................................................................................. 4 

3.1 Cautions for Installation and Storage ........................................................................................ 4 

3.2 Environmental Conditions for Installation, Storage, and Operation ........................................... 4 

3.3 Location .................................................................................................................................... 4 

3.4 Operational Checks Following Installation ................................................................................ 5 

3.5 Electric connection ................................................................................................................... 5 

3.6 Fluctuations in the power voltage and frequency ...................................................................... 6 

3.7 The rubber leg installation method of accessories   .................................................................. 6 

3.8 Piping ....................................................................................................................................... 7 

3.9 Storage ..................................................................................................................................... 7 

 

4.  Cautions for Operation ................................................................................................................... 8 

4.1 Cautions for Operation .............................................................................................................. 8 

4.2 Operation of the Thermal Protection Relay ............................................................................... 8 

4.3 Starting in Cold Weather ........................................................................................................... 8 

 

5.  Pump Performance......................................................................................................................... 8 

5.1 Ultimate Pressure ..................................................................................................................... 8 

5.2 Pumping Speed ........................................................................................................................ 9 

5.3 Power Requirements ................................................................................................................ 9 

 

6.  Maintenance, Inspection, and Repair ............................................................................................. 9 

6.1.Cautions for Maintenance, Inspection, and Repair .................................................................... 9 

6.2 Maintenance ........................................................................................................................... 10 

Содержание DOP-181S Series

Страница 1: ...P 181SC DOP 181SD DOP 181SE Request to Users Please read this manual thoroughly to ensure safe and effective use of the equipment Keep this manual in a safe place Due to periodic improvements in perfo...

Страница 2: ...ressors and vacuum pumps Safety requirements Part2 Vacuum pumps IEC EN 61010 1 2010 A1 2019 Safety requirement for electrical equipment for measurement control and laboratory use Part1 General require...

Страница 3: ...is in conformity with the following standards BS EN 1012 2 1996 A1 2009 Compressors and vacuum pumps Safety requirements Part2 Vacuum pumps BS IEC EN 61010 1 2010 A1 2019 Safety requirement for elect...

Страница 4: ...Environmental Conditions for Installation Storage and Operation 4 3 3 Location 4 3 4 Operational Checks Following Installation 5 3 5 Electric connection 5 3 6 Fluctuations in the power voltage and fr...

Страница 5: ...Tables Fig 2 1 DOP 181SA 181SB 2 Fig 2 2 DOP 181SC 181SD 3 Fig 2 3 DOP 181SE 3 Fig 3 1 Change region of the voltage and frequency 6 Fig 3 2 Example of Piping Used When Evacuating a Vessel 7 Fig 6 1 E...

Страница 6: ...nt correctly Read the section on Safe Use particularly closely Keep This Manual in a Safe Place After reading this manual be sure to keep it in a safe place which is readily accessible to others needi...

Страница 7: ...oblems with the pump 1 When take out a pump from a packing box Do not grip the pipe of the upper of the pump In addition please do not do an act bending by pushing A pipe is damaged and pump performan...

Страница 8: ...the equipment may result in death or serious injury to the operator Incorrect handling of the equipment may result in light or medium injuries to the operator or damage to the equipment Incorrect han...

Страница 9: ...s may decline an overhaul Please pay attention enough 4 To reduce the risk of fire and explosion damage enclose the pump by non flammable cover Power Supply 5 Always switch off the main power supply a...

Страница 10: ...or objects into the motor inlet may result in electric shock injury or fire 18 Operating the pump with the discharge outlet blocked or with a device which prevents passage of gas to the discharge outl...

Страница 11: ...When the thermal protector operates the pump will become extremely hot Please do not touch the pump Touching the pump in that condition will cause burn injury Turning off the main power supply of the...

Страница 12: ...istics 5 This pump is only for vacuum pumping Use at near atmospheric pressures for long periods of time may result in a malfunction Operation 6 Use the pump at an ambient temperature of Ambient tempe...

Страница 13: ...mpt to evacuate gases containing particles dust water or corrosive gases 5 Do not operate the pump for long periods at near atmospheric pressure 1 2 Specifications Table 1 1 Product Specifications DOP...

Страница 14: ...rcuit automatically to prevent burn out if the motor temperature rises due to overloading or there is a pump fault which prevents rotation 2 Always fit other protective devices eg earth leakage breake...

Страница 15: ...Fig 2 2 DOP 181SC 181SD Fig 2 3 DOP 181SE...

Страница 16: ...ve gas f Not subject to direct sunlight g No danger of fire h Do not exceed the maximum ambient temperature of the temperature range of product specification at the time of pump installation refer to...

Страница 17: ...r higher one earth wire included 3 Phase motor 4 Core cable Size of the wire lead 1 0m or larger 300V or more 10A or more 80 or higher one earth wire included The temperature rating of the power cord...

Страница 18: ...lting in the grade which shortens a life remarkably and the characteristic a temperature rise etc do not apply correspondingly in the state of rating Moreover main rating shows rated torque N m 3 7 Th...

Страница 19: ...ge pressure 4 In case of selecting the inlet pipe and exhaust pipe that are not from our products please select the exhaust pipe that has same or larger inner diameter length with the inlet pipe 5 Ple...

Страница 20: ...5 6 and 9 on p 06 Immediately switch off the main power and contact to the manufacturer when thermal protector is activated 4 3 Starting in Cold Weather The bearing grease and cup packing may harden u...

Страница 21: ...value achieved with dry air 5 3 Power Requirements The power required to operate the pump is the total of the work required to overcome the rotational resistance of the pump mechanical work and the wo...

Страница 22: ...SUS 6000 Hr O ring 4 EPDM 6000 Hr Head gasket 2 EPDM 6000 Hr Bearing 1 set 15000 Hr Power supply cord 1 set At any time Life of these components tends to be extended when the requirements in 4 1 Cauti...

Страница 23: ...ediately after operation After stopping the pump leave it for 30 minutes or more and begin replacing consumables and cleaning only after checking that it has cooled sufficiently 2 To prevent ingestion...

Страница 24: ...pump Refer to the exploded view Fig 6 1 Remove all cap screws M6 95L 8 No 1 that fasten the pump head No 2 to the Casing Remove the pump heads assembly No 5 Head gasket No 6 is attached inside the pum...

Страница 25: ...e a new O rings Clean a connecting pipe s O ring groove installation hole before replace The head gasket gets pinched when extruding from the gasket groove Ensure that head gasket are fully assembled...

Страница 26: ...rts Photo7 Cylinder Gasket Photo8 Cup packing Connecting rod 6 4 7 Reassembling the pump Refer to the exploded view Fig 6 1 clause 6 4 2 Disassembling the pump Place the cup packing cup packing retain...

Страница 27: ...Fig 6 1 Exploded view OUTLET INLET...

Страница 28: ...2 Measure the pressure correctly 5 1 3 Vacuum gauge is unsuitable 3 Measure with a calibrated vacuum gauge suitable for the pressure range 5 1 4 The inlet piping is too small in diameter or too long...

Страница 29: ...ons maintenance and inspection etc d Malfunctions caused by modifications or repairs carried out by a party other than the manufacturer or by a service company not approved by the manufacturer e Malfu...

Страница 30: ...Industrial Safety and Health Law designates particular substances as the materials to be notified 2 Usage Status Operation Method Approx hours per day years and months Continuous Operation Intermitte...

Страница 31: ...6 6397 2286 ULVAC KIKO Inc https ulvac kiko com en Please contact us for products Service Base or other Inquiries from here ULVAC Inc Components Division 2500 Hagisono Chigasaki Kanagawa 253 8543 Japa...

Отзывы: