![UFSK 500 ECO Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/ufsk/500-eco/500-eco_user-and-service-manual_3240233018.webp)
Manual_500 ECO_SN0001-following_0520
500 ECO
www.ufsk-osys.com
User and Service Manual
Page 18 of 50
Symbols
Meaning
Observe the 10%....95% moisture limit!
Observe the 660hPa….1,080hPa atmospheric pressure limit!
5.
Putting Into Service
5.1. Unpacking the chair
1.
Cut the fastener straps and pull the
cardboard container up and off.
2.
Carefully remove the packaging foil;
Attention
• Never cut cardboard containers open to avoid damaging their contents!
•
Please bear in mind that the chair first needs to acclimatize to room temperature prior to first use after
delivery if it was exposed to extremely low external temperatures during shipping. In case of high
temperature fluctuations (during storage and shipping), the chair should be given an acclimatization
period of approx. 2 hours to observe the maximum admissible temperature change of 20 K/h.
• Please lift the treatment chair only by the metal frame of the running gear.
5.2. Setting the chair up
The treatment chair will be supplied in nearly assembled condition. To minimize packing dimensions, the back-,
head- and armrests elements are not assembled. They simply have to be inserted into the corresponding openings.
Important Information
•
Carefully remove all packaging materials (packaging film, foamed packaging material, straps, etc.)
•
The packaging materials are recyclable and should be dispatched for recycling.
Below please find an illustrated description of the most important work steps required for the chair’s final assembly: