background image

  Doc.  83081F  – Rev. 02/10/14 

 7 / 8   

 

                      DIS. 22745/b 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

S C H E M A  D I   C O L L E G AM E N T O   E L E T T R I C O   C O N S I G L I AT O   P E R   U N   AT T U AT O R E    

 

 

E L E C T R I C AL   C O N N E C T I O N   S U G G E S T E D   F O R   S I N G L E   H AT C H   L I F T I N G   S Y S T E M  

 

B R AN C H E M E N T   E L E C T R I Q U E   C O N S E I L L É   AV E C   U N   S E U L   AC T I O N N E U R  

 

 

   

GB

 

I

 

F

 

PULSANTE UNIPOLARE O COMMUTATORE A MOLLA 
CON ZERO CENTRALE 
 
3 POSITION CHANGE-OVER CENTRE OFF MOMENTARY 
2 SIDES 
 
BOUTON  OU COMMUTATEUR UNIPOLAIRE AVEC 
CONTACT INSTANTANÉ ET OFF CENTRAL

 

 
SW20 – art. 61101T 

 

QUESTI COLLEGAMENTI POSSONO ESSERE ESEGUITI 
CON LA "RELE' BOX UCS". 

 

THESE CONNECTIONS CAN BE  ALL EXECUTED USING 
A  "UCS RELAIS BOX". 

 

CES CONNEXIONS PEUVENT ÊTRE EXÉCUTÉS PAR LA 
"RELE BOX UCS". 

 

RB12 - art. 40738Y 
RB24 - art. 40742C

 

 

fig. 4

 

Содержание ULYSSES 1812

Страница 1: ...dc 10 30 Assorbimento nominale Nominal current absorption Courant absorbe 2 A 1 A 2 A 1 A Corsa Stroke Course 180 mm 7 180 mm 7 300 mm 12 300 mm 12 Forza in spinta Force in push action Force en pouss...

Страница 2: ...tuatore in relazione alle caratteristiche dell elemento mobile portellone e alle posizioni di fissaggio dell attuatore stesso Attenzione Carico max di lavoro Fmax per l attuatore 650 N Fissare le staf...

Страница 3: ...proprio CORRETTO SMALTIMENTO DEL PRODOTTO Il corretto smaltimento delle apparecchiature obsolete contribuisce a prevenire possibili conseguenze negative sull ambiente Please read very carefully these...

Страница 4: ...accuracy and solidity of all electrical connections Connect the power supply and check the operation TROUBLE SHOOTING Problem Hatch will not open Solution Wiring connections are incorrect Power suppl...

Страница 5: ...tion doit tre faite par personnel qualifi Avant de proc der au montage contr ler que les performances de l actionneur sont bien conformes l application pr vue les profils et les accessoires du sabord...

Страница 6: ...tween 0 and 0 5 if c a 0 5 use K 1 Valeurs du coefficient K en cas de rapport c a compris entre 0 et 0 5 si c a 0 5 utiliser K 1 b d 0 1 0 15 0 2 0 3 0 4 0 5 1 0 2 0 3 0 4 0 5 0 6 0 7 0 8 0 9 0 10 0 c...

Страница 7: ...B I F PULSANTE UNIPOLARE O COMMUTATORE A MOLLA CON ZERO CENTRALE 3 POSITION CHANGE OVER CENTRE OFF MOMENTARY 2 SIDES BOUTON OU COMMUTATEUR UNIPOLAIRE AVEC CONTACT INSTANTAN ET OFF CENTRAL SW20 art 611...

Страница 8: ...Doc 83081F Rev 02 10 14 8 8 DIS 22745 b...

Отзывы: