17
LT---- (iss -- --/--)
UC Living Arranmore SC
Installation Instructions
SECTION NINE
To Install the Appliance
CHECKING THE FLUE AND FIRE OPENING
Check that the chimney conforms to the required specifications as previously stated. Examine the
condition and carry out any remedial work including removing any debris from the base.
If the flue has been used for solid fuel it should be swept prior to the installation
Prior to installing the appliance a smoke test (using a smoke bomb) should be carried out to check
that satisfactory smoke clearance has been established.
If all the smoke is not drawn into the flue, pre-heat the flue with a blowtorch or similar and re-
check. If there is any uncertainty examine for the cause and, if necessary, seek expert advice.
No combustible material should be fitted inside the fireplace opening.
When installing this appliance against a dry lined (plasterboard) wall ensure that any void
between the plasterboard and the wall is sealed with a suitable non-combustible material (i.e.
plaster or mortar).
GAS SUPPLY ROUTING
Use rigid or semi
– rigid tube to connect
the supply. Determine the gas supply
pipe route to the appliance before
installing the fire.
STANDARD TRIM & FRET
This may be from the front of the unit,
either from the left or from the right hand,
or it can be a concealed fitting from the
rear of the appliance.