Connecting Ethernet 

Turn the 

Cover

 

Lock

 to the 

Unlocked

  icon. Slide the 

Port

 

Cover

 down to remove it. 

 
Connect a TOUGHCable or other outdoor, shielded CAT5e/6 cable to the 

DATA

 

port. 

 

Create a strain relief for the Ethernet cable by feeding a 

Cable

 

Tie

 through the tie slot alongside the cable.  

 

Then wrap the 

Cable

 

Tie

 around the cable and tighten.  

 
Connect the other end of the Ethernet cable from the 

DATA

 port to the Ethernet port labeled 

POE

 on the PoE Adapter. 

 
Connect an Ethernet cable from your network to the Ethernet port labeled 

LAN

 on the 

PoE

 

Adapter.

 

 

Connect the 

Power

 

Cord

 to the power port on the 

PoE

 

Adapter.

 

Connect the other end of the 

Power

 

Cord

 to a power source. 

 

 

Note: For added protection, we recommend installing 
two GigE PoE surge protectors. Install the first surge 

protector within one meter of the airFiber 

DATA

 port, 

and install the second surge protector at the ingress 
point of the location housing the wired network 
equipment. 

 

Alignment 

Tips 

We recommend using a pair of installers in constant communication because in the fine tuning stage, one installer makes azimuth and 

elevation adjustments on one airFiber radio while the other installer reports the received signal level at the other airFiber radio. (Fine‐
tuning is necessary because the main lobe of the receiver is more narrow than that of the transmitter, in both azimuth and elevation.) 

To accurately align the airFiber radios for best performance, you MUST align only one end of the link at a time. 

For more convenient alignment, you may consider using long range scopes (not included) temporarily attached to your airFiber radios. 
You may need to use additional hardware to compensate for issues such as the improper orientation of a mounting pole or significant 

elevation differences between the airFiber radios.

 

Establishing a Preliminary Link 

Adjust the positions of the 

Master

 and the 

Slave

 to establish a preliminary link. This requires the 

Master

 and 

Slave

 to be within a few degrees 

of the line of sight between the airFiber radios. 

 

Note: The 

Master

 must be aimed first at the 

Slave

 because 

the 

Slave

 does not transmit any RF signal until it detects 

transmissions from the 

Master

 
For the 

Master

 and 

Slave

, ensure the eight 

Lock

 

Bolts

 on the 

Alignment

 

Bracket

 are sufficiently loose by spinning each washer by hand. 

 

 

WARNING: All

 

Lock

 

Bolts

 MUST be loose to avoid damage 

to the airFiber housing. 

 

 

 

 

 

Содержание AF-5U

Страница 1: ...2 Cable Ties Qty 2 airFiber AF5U Quick Start Guide PoE Adapter 50V 1 2A GigE Power Cord Hardware Overview Side Back Interfaces Interface Description RESET To reset to factory defaults press and hold t...

Страница 2: ...d Off 10Mbps On 100 Mbps Link Act Off No Ethernet Link On Ethernet Link Established Random Flashing Ethernet Activity Status LEDs GPS Off No GPS Synchronization On Operational Strong Signal Normal Fla...

Страница 3: ...installations at least 3 meters below the top of the tower Ground wires min 8 AWG 10 mm2 and max length 1 meter As a safety precaution ground the airFiber radios to grounded masts poles towers or grou...

Страница 4: ...ATA port and connect an Ethernet cable between your computer and the MANAGEMENTport Configure the device settings in the airFiber Configuration Interface Once configuration is complete disconnect the...

Страница 5: ...gure one airFiber AF5U as the Master and the other as the Slave Duplex The airFiber AF5U supports both half duplex and full duplex operation Half duplex operation provides more frequency planning opti...

Страница 6: ...k the Wireless tab Enter the Basic Wireless Settings For one airFiber AF5U select Master from the Wireless Mode drop down For the other airFiber AF5U keep the default Slave Enter a name in the Link Na...

Страница 7: ...and then click Apply In Band Management is enabled by default so each airFiber radio must have a unique IP Address If the airFiber radios use the same IP Address then you may lose access to the airFib...

Страница 8: ...th and elevation adjustments on one airFiber radio while the other installer reports the received signal level at the other airFiber radio Fine tuning is necessary because the main lobe of the receive...

Страница 9: ...ent make adjustments on one end of the link while the other installer reports the received signal level at the other end of the link Do NOT make simultaneous adjustments on the Master and Slave Slave...

Страница 10: ...47 IC RSS 210 Max EIRP 47 dBm per transmit chain Max Power Consumption 50 W Power Supply 50V 1 2A PoE GigE Adapter Included Power Method Passive Power over Ethernet 42 58VDC Certifications CE FCC IC M...

Страница 11: ...ed without an RMA number will not be processed and will be returned to Buyer freight collect UBIQUITI NETWORKS shall have no obligation to make repairs or replacement necessitated by catastrophe fault...

Страница 12: ...strie Canada exempts de licence norme s Son fonctionnement est soumis aux deux conditions suivantes Cet appareil ne peut pas provoquer d interf rences et Cet appareil doit accepter toute interf rence...

Страница 13: ...i Lithuanian UBIQUITI NETWORKS deklaruoja kad is UBIQUITI NETWORKS renginys atitinka esminius reikalavimus ir kitas 1999 5 EB Direktyvos nuostatas Malti Maltese Hawnhekk UBIQUITI NETWORKS jiddikjara l...

Отзывы: