Fig. 8:
Attach slanted beam (K1) & middle beam (K2) to top connector (J) with bolts (AA) and washers (BB).
Fig. 9:
Attach the lower side of slanted beam (K1) to post (A) with bolts (DD), washers (BB) and nuts (EE).
Fig. 10
: Attach the lower side of middle beam (K2) to top bar connector (H) with screws (DD), washers (BB) and nuts (EE).
Fig. 11
: Attach the lower side of top short beam 1 / top short beam 2 (L1/L2) to middle beam (K2) with screws (FF) and
washers (BB).
Hardware pack 2
Part
Description
Part No
Quantity
Image
AA
M6X20 Bolt
BM06020C
16
BB
M6 Washer
UD06C
96
DD
M6X55 Bolt
BM06055C
16
EE
M6 Nut
LM06C
16
FF
M6X15 Screw
SM06015C
48
Fig. 7:
Attach triangle support (D) to each post (A)
and roof bar with bolts (HH) and washers (BB).