D
I
1
A
Left
to
right
opening
B
Right
to
left
opening
The instructions illustrate the right
with a left
follow
side. Follow all illustrations in reverse.
should always be located at
to
left
opening(see illustration A).
For
an
installation
to
right
opening(see illustration B)
,
the
same
instructions
,
switch
around
the
panels
(G)
and
(P),then mount the panel(P)and
its
rail(D)in
the
opposite
Pay
attention
on
the
position
of
the
door
handles
holes
and
the
hinges
(mirror
effect)
,
the
handle(J)
the
bottom
of
the
handle(I)
.
Shower
reversibility
THIS
SHOWER
IS
REVERSIBLE
G
1
.
Plumbing
and
installing
the
shower
base
Studs are required
as
support
for
tracks
.
1
Silicone
Tiles
are
over
the
lip
of
the
base
.
Base
lip
.
Drywall
is
flush
with
lip
of
the
1A
.
Ensure
that
all
raw
plumbing
has
been
prepared
before
installing the
shower
.
1B
.
Ensure
that
the
base
is
level
by
adjusting
the
leveling
screws
under
the
base
.
1C
.
Once
in
place
,
the
inner
surface
of
the
lip
of
the
base
must
be set
flush
with
the
drywall.
Notes
:
from the drywall, but it should be installed
have a
•
The
base
&
lip
may
be
minimally
protruding
flush
enough
to
tile
the
shower
.
•
Measure
the
thickness
of
your
tiles
on
either
side
before
installing
the
metal
tracks
.
Make
sure
to
tile
thickness
less
than
½
in
13mm
,
a
thicker
tile
will
limit
your
space
to
install
the
shower
panels
.
Before
continuing
the
installation
:
•
Ensure
proper
installation
of
the
drain
and
test
for
leaks
prior
to
installing
the
remaining
pieces
of
shower
unit
.
•
Verify
that
the
base
floor
is
draining
correctly
.
•
Verify
all
pipe
connections
to
ensure
no
leakage
occurs
.
•
Tile your wall (follow tile installation
instructions) and allow grout to dry completely
for 24 hours before installing your shower doors
.
(
)
6
7
P
G
J
J
D
2 9 1
/2 " (
749m
m )
3 7 1/4"
(946m
m )
2A
2D
2C
2B
Installing
the
shower
without
acrylic
base
If
you
have
our
acrylic
shower
base
,
please
follow
in
page
7
.
instructions
Studs are required
as
support
for
tracks
Notes
:
Make
sure
to
have
a
distance
of
29
½
in 749mm
from
left
side
wall
to
the
inside
edge
of
aluminum
track
.
Make sure to have a distance of 37 1/4 in 946mm from
the right side wall to the inside edge of aluminum track.
2A.
Make sure wall tracks (D) are perfectly levelled vertically
and mark
the track hole positions.
2B. Once tracks are leveled, mark their holes of the
frames clearly on the wall (or tiles).
2C. Remove the frames and make sure that
the distance is correct. Then drill pilot holes at the marked locations.
Note: It is recommended that a small diameter bit be used when
first drilling ceramic tiles to avoid breaking them. Begin
with the smaller bit and gradually move to larger drill bits
until the proper sized hole is attained.
2D. Make sure that the final hole is large enough for wall plugs (4) to fit
snugly and then insert the wall plugs using a rubber mallet (to avoid
breaking the tiles) until the plugs are flush with the tile surface.
(
)
(
)
8
S1
R1
About
20mm
D
749
m m
inside edge
D
94
6 m m
3C
inside edge
D
S2
R2
9
Installation
of
Aluminum
tracks
2E
2E
D
D
3D
2E. Make sure the frames (D) are properly installed, then proceed
with installation using screws (3) , making sure to have the oval
holes of the rails facing the internal side of the shower. Do not over-
tighten; an excessive tightening could possibly crack the tiles.
Cut the box in the same shape as the shower base
and place cutout over base for protection.
Attention:
be installed before installing the tiles.
in a new construction, the shower base
should
!
Содержание 98495003
Страница 1: ...7...