background image

D

I

1

A

Left

 

to

 

right

 

opening

B

Right

 

to

 

left

 

opening

The  instructions  illustrate  the  right

with  a  left

follow

side.  Follow  all  illustrations  in  reverse.

should  always  be  located  at

 

to

 

left

 

opening(see  illustration  A).

For

 

an

 

installation

 

 

to

 

right

 

opening(see  illustration  B)

,

 

the

 

same

 

instructions

switch

 

around

 

the

 

panels

 

(G)

 

and

 

(P),then  mount  the  panel(P)and

 

its

 

rail(D)in

 

the

 

opposite

 

Pay

 

attention

 

on

 

the

 

position

 

of

 

the

 

door

 

handles

 

holes

 

and

 

the

 

hinges

 

(mirror

 

effect)

,

the

 

handle(J)

 

the

 

bottom

 

of

 

the

 

handle(I)

.

 
 

Shower

 

reversibility

THIS

 

SHOWER

 

IS

 

REVERSIBLE

G

1

.

Plumbing

 

and

 

installing

 

the

 

shower

 

base

Studs  are  required

 

as

 

support

 

for

 

tracks

.

1

Silicone

Tiles

 

are

 

over

 

the

 

lip

 

of

 

the

 

base

Base

 

lip

.

Drywall

 

is

 

flush

 

with

 

lip

 

of

 

the

 

1A

.

Ensure

 

that

 

all

 

raw

 

plumbing

 

has

 

been

 

prepared

 

before

 

installing  the

 

shower

1B

.

Ensure

 

that

 

the

 

base

 

is

 

level

 

by

 

adjusting

 

the

 

leveling

 

screws

 

under

 

the

 

base

.

1C

.

Once

 

in

 

place

  ,

the

 

inner

 

surface

 

of

 

the

 

lip

 

of

 

the

 

base

 

must

 

be  set

 

flush

 

with

 

the

 

drywall.

Notes

:

from  the  drywall,  but  it  should  be  installed

have  a

The

 

base

  & 

lip

 

may

 

be

 

minimally

 

  protruding

 

 

flush

 

enough

 

to

 

tile

 

the

 

shower

.

• 

Measure

 

the

 

thickness

 

of

 

your

 

tiles

 

on

 

either

 

side

 

before

 

installing

 

the

 

metal

tracks

.

Make

 

sure

 

to

 

 

tile

 

thickness

 

less

 

than

 

½

 

in

 

13mm

,

 

a

 

thicker

 

tile

 

will

 

limit

 

your

 

space

 

to

 

install

 

the

 

shower

 

panels

.

Before

 

continuing

 

the

 

installation

:

• 

Ensure

 

proper

 

installation

 

of

 

the

 

drain

and

 

test

 

for

 

leaks

 

prior

 

to

 

installing

the

 

remaining

 

pieces

 

of

 

shower

 

unit

.

• 

Verify

 

that

 

the

 

base

 

floor

 

is

 

draining

 

correctly

.

• 

Verify

 

all

 

pipe

 

connections

 

to

 

ensure

 

no

 

leakage

 

occurs

.

• 

Tile  your  wall  (follow  tile  installation 

instructions)  and  allow  grout  to  dry  completely 

for  24  hours  before  installing  your  shower  doors

.

(

)

6

7

P

G

J

J

D

2 9 1

/2 " (

749m

m )

3 7 1/4"

(946m

m )

2A

2D

2C

2B

Installing

 

the

 

shower

 

without

 

acrylic

 

base

If

 

you

 

have

 

our

 

acrylic

 

shower

 

base

,

please

 

follow

 

 

in

 

page

 

7

.

instructions

Studs  are  required

 

as

 

support

 

for

 

tracks

Notes

:

Make

 

sure

 

to

 

have

 

a

 

distance

 

of

 

29

 

½

 

in 749mm

 

from

 

left

 

side

wall

 

to

 

the

 

inside

 

edge

 

of

 

aluminum

 

track

.

Make  sure  to  have  a  distance  of  37  1/4  in 946mm   from

the  right  side  wall  to  the  inside  edge  of  aluminum  track. 

2A. 

Make  sure  wall  tracks  (D)  are  perfectly  levelled  vertically

  and  mark 

the  track  hole  positions.

2B.  Once  tracks  are  leveled,  mark  their  holes  of  the

frames  clearly  on  the  wall  (or  tiles).

2C.  Remove  the  frames  and  make  sure  that

the  distance  is  correct.  Then  drill  pilot  holes  at  the  marked  locations.

Note:  It  is  recommended  that  a  small  diameter  bit  be  used  when

first  drilling  ceramic  tiles  to  avoid  breaking  them.  Begin

with  the  smaller  bit  and  gradually  move  to  larger  drill  bits

until  the  proper  sized  hole  is  attained.

2D.  Make  sure  that  the  final  hole  is  large  enough  for  wall  plugs  (4)  to  fit 

snugly  and  then  insert  the  wall  plugs  using  a  rubber  mallet    (to  avoid 

breaking  the  tiles)  until  the  plugs  are  flush  with  the  tile  surface.

(

)

(

)

8

S1

R1

About

 

20mm

D

749

m m

inside  edge

D

94

6 m m

3C

inside  edge

D

S2

R2

9

Installation

 

of

 

Aluminum

 

tracks

2E

2E

D

D

3D

2E.  Make  sure  the  frames  (D)  are  properly  installed,  then  proceed 

with  installation  using  screws  (3)  ,  making  sure  to  have  the  oval 

holes  of  the  rails  facing  the  internal  side  of  the  shower.  Do  not  over-

tighten;  an  excessive  tightening  could  possibly  crack  the  tiles.

Cut  the  box  in  the  same  shape  as  the  shower  base 

and  place  cutout  over  base  for  protection.

Attention:

  be  installed  before  installing  the  tiles. 

in  a  new  construction,  the  shower  base

should

!

Содержание 98495003

Страница 1: ...7...

Страница 2: ...Philips flat head screw 1 1 8 ST4 30 Philips round head screw Wall plug Decorative cap 2 5 allen key small Screwdriver Silicone Drill level Adjustable spanner wrench Tape measure Rubber mallet Heavy d...

Страница 3: ...ndle for the shower door Internal handle for the shower door Bottom door rubber strips Waterproof aluminum track for the base Glass support clips Bottom glass panel rubber strips K1 short K2 middle K3...

Страница 4: ...that the base is level by adjusting the leveling screws under the base 1C Once in place the inner surface of the lip of the base must be set flush with the drywall Notes from the drywall but it should...

Страница 5: ...e marked locations Note It is recommended that a small diameter bit be used when first drilling ceramic tiles to avoid breaking them Begin with the smaller bit and gradually move to larger drill bits...

Страница 6: ...el on the wall then position A on the wall and mark the line 4C Drill hole on the marked line Note it is recommended that a small diameter bit be used when first drilling tiles to avoid cracking them...

Страница 7: ...ion to have handle holes on the correct side as indicated on the drawing 8 4 5B H 4 H Installing the shower hinges Installing the rubber seal tracks 6A Install the vertical shower door rubber track E1...

Страница 8: ...mm G P 3 3 2 10mm 100mm 1 0 m 0 m Glass Middle Inside Outside 7B Installing the track screws J H H I 8A 8B 8C 8A Prepare the assembly of the two handles I J 8B Install the handle J as shown and make s...

Страница 9: ...et and the rubber seal and tighten using the Allen key 8 9D Repeat the same operations to install the second bracket on the other side 3 2mm 1 8 Add a drop of silicone to the drilled hole before insta...

Страница 10: ...on and freight or handling charges The present warranty does not cover defects damages resulting from an Act of God accident catastrophe abuse negligence improper installation addition or removal of p...

Страница 11: ...lui ci jusqu ce que l installation soit compl t e V rifiez toutes les pi ces afin de vous assurer qu aucune n est endommag e Si c tait le cas avant l installation communiquez avec le Service la client...

Страница 12: ...ips de 5 8 po ST4 14 Vis t te ronde Philips de 1 1 8 po ST4 30 Prises murales Capuchons d coratifs Cl Allen de 2 5 mm petite 2 5 mm 3 mm 4 mm Cl Allen de 3 mm moyenne Cl Allen de 4 mm grande Outils n...

Страница 13: ...e int rieure de porte de douche Supports pour panneaux de verre Rail d tanch it horizontal en caoutchouc pour le bas de la porte de douche Rail d aluminium tanche pour la base Bandes magn tiques pour...

Страница 14: ...nivellement sous la base 1C Une fois en place la surface int rieure du rebord de la base doit tre align e avec le panneau de pl tre 1D Allez la page 29 Notes 0 1 234 5 0 d coll s du panneau de pl tre...

Страница 15: ...on de la grosseur de trou voulue 2D Assurez vous qu au final les trous sont suffisamment grands pour que les prises murales 4 s y glissent parfaitement Ins rez les prises murales l aide d un maillet d...

Страница 16: ...neau de verre Assurez vous que la barre de support est bien plat sur le mur puis marquez l emplacement du manchon A au crayon 4C Percez un trou l emplacement indiqu Note Il est recommand d utiliser un...

Страница 17: ...charni res en utilisant la cl Allen 8 Note Assurez vous que les trous pour les poign es de porte sont bien positionn s tel qu illustr Int rieur Int rieur Ext rieur 6A Installez les rails d tanch it v...

Страница 18: ...acements indiqu s 7C Assemblez les panneaux G et P avec les rails en utilisant les vis 1 Ajoutez les capuchons d coratifs 5 tel qu illustr E n v i r o n 2 0 m m 8A D montez les pi ces des deux poign e...

Страница 19: ...cl Allen 8 9D R p tez les m mes op rations pour installer le second support de l autre c t Versez une goutte de silicone dans le trou perc avant d installer la vis et les supports 10A Placez le rail d...

Страница 20: ...ges occasionn s par un acte fortuit un accident une catastrophe un abus une n gligence une installation incorrecte l ajout ou l enl vement de pi ces ou d quipements une mauvaise utilisation des variat...

Отзывы: