background image

USE AND MAINTENANCE OF TIMBER SWIMMING POOLS

i

 

 Failure to comply with the maintenance instructions may lead to serious risks to 
health, particularly where children are concerned.

1. TREATING THE WATER 

Your swimming pool installation is complete!  Before you get into the pool for the first time, it is essential to “prepare” the water. Bathing often leads to 
a good deal of pollution caused by things like vegetation, earth, dust, sweat, saliva, hair, grease, etc. The swimming pool water must be protected from 
these substances in order to avoid various micro-organisms developing.   

In order to do this, a few simple rules may be applied:

-  It is a good idea to have the filter running during the day, as it is bathing that causes most of the pollution. Regulate the timing of the filter according to 

the temperature of the water. The higher the temperature of the water, the more easily bacteria will grow. 

Water Temperature

< 10°

10-12°

12-16°

16-24°

24-27°

27-30°

Filtration time

2h

4h

6h

8h

10-12h

-> 20h

Generally speaking, whatever type of system you have, any impurities should be removed if the pool is cleaned regularly using the filter.

 

The sand filter

: When the amount of impurities in the sand increases, the circulation of the water becomes less efficient and consequently the pressure 

increases. Refer to the notes on maintaining the filtration unit for cleaning it. 

-  Analyse the water in your swimming pool: it is a worth checking the pH level (degree of acidity or alkalinity of the water) every week. It should always 

range between 7.2 and 7.6. An incorrect pH level may result in the water treatment products working less efficiently, may accelerate the development of 
chloramines (causing unpleasant odours and irritation of the mucous membranes…) and the corrosion of any metal parts.. 

-  Treat the water regularly: a weekly disinfectant treatment (bromine, chlorine and active oxygen…) against bacteria will avoid all the problems caused by 

poor quality water. One treatment every fortnight with an algaecide effectively combats the initial appearance and further development of algae.

i

  

Using and storing chlorinated products

Remember that these are dangerous products that must be stored 

and used only as directed by the manufacturers. Do not mix chemical 

products with each other. Store products in tightly closed containers 

in a cool and well ventilated place; do not expose to direct sunlight. 

If using a container for measuring out chemicals, rinse thoroughly 

after each use. Read the safety information and instructions provided on 

each label carefully. Keep all chemicals out of reach of children..

-  Everyday remove as much dirty matter from the pool as possible with a fishing net (fallen leaves, dead insects…) and clean the surface of the water 

regularly to remove greasy deposits.

-  Empty the pump container. Just like the skimmer container, it is a good idea to empty it regularly to maintain the optimum filtration level.

Annual treatment: In order to have clean water all the time, clean the filter, change about ⅓  to ½ of the water in the pool and look after it properly through 
the winter. Change all the water in your pool every 3 to 4 years.

Problems and solutions :

PROBLEMS

CAUSES

SOLUTIONS

1. Water clear with greenish or   

    brownish tint. 

    Large number of brown stains    

    on the sides of the pool. 

Oxidation of metallic salts (iron or copper) present 

in the water used to fill the pool

Check the pH level. Put in a calcium and metal 

stabiliser when you fill the pool. Clean out the filter. 

Remove sediment and filter continuously.

pH level too low. Corrosion of metal parts.

2. Water has a yellow or brownish tint

Water being used to fill the pool is high in iron or 

manganese

See  1.

3. Water milky and cloudy

Organic and colloidal impurities

Chlorinate thoroughly. Clean the filter. Remove 

sediment and filter well.

Inorganic substancesincreasing the hardness of the 

water

Check the pH level. Put in a calcium and metal 

stabiliser when you fill the pool.

4.  Slimy green deposits on the sides of 

the pool

Build up of algae

Chlorinate thoroughly. Treat with an algaecide

5. Sides of the pool have an 

    uneven appearance

Calcium deposits caused by hard water

Check the pH level. Put in a calcium and metal 

stabiliser. If the pool is empty clean with a pool 

descaler.

6.  Irritation to skin and eyes, unpleasant 

odour

Presence of combined chlorine (chloramine) 

Adjust the pH level. Chlorinate thoroughly. Put in 

fresh water

7

.

 Evidence of corrosion

pH level too low

Increase the pH level to 7.0 – 7.4

22

NOTICE 610-860 2010.indd   23

02/02/10   09:26

Содержание 610

Страница 1: ...610 860 NOTICE 610 860 2010 indd 2 02 02 10 09 26 ...

Страница 2: ...chten Sie bitte darauf die Holzelemente flach in einem kühlen und gelüfteten Raum vor Sonnenbestrahlung und Witterungseinflüssen geschützt aufzubewahren Die Spalten Astlöcher und Bruchstellen mit geringen Ausmaßen in Höhe der Leisten wirken sich auf die mecha nische Festigkeit des Holzes keinesfalls beeinträchtigend aus Diese Veränderungen können im Rahmen von Produktreklamationen auf keinen Fall ...

Страница 3: ... element used in building UBBINK swimming pools is a living substance and is liable to beco ming warped if stored in adverse conditions Make sure that you store all the wooden parts flat in a cool well ventilated place out of the sun and protected from bad weather Any cracks knots and small faults on the surface of the strips do not in any way affect the wood s resistance It certainly shouldn t be...

Страница 4: ...y fije un cartel cerca de la piscina con los teléfonos de primeros auxilios Bomberos 112 Cruz Roja 112 Centro de asistencia toxicológica AVVERTENZA Il legno componente principale delle piscine UBBINK è un materiale vivo suscettibile di deformazioni in caso di stoc caggio in cattive condizioni Assicuratevi di stoccare in orizzontale gli elementi in legno in un locale fresco e ventilato al riparo da...

Страница 5: ...5 20 cm minimum 24 m 400 x 610 20 cm minimum mindestens 20 cm minimaal 20 cm 20 cm minimum 20 cm como mínimo 20 cm minimo NOTICE 610 860 2010 indd 6 02 02 10 09 26 ...

Страница 6: ...6 20 cm minimum 40 m 470 x 860 20 cm minimum mindestens 20 cm minimaal 20 cm 20 cm minimum 20 cm como mínimo 20 cm minimo NOTICE 610 860 2010 indd 7 02 02 10 09 26 ...

Страница 7: ...der Montagearbeiten des Schwimmbads Algemeen overzicht van de installatie van een zwembad General diagram for installing a swimming pool Esquema general de instalación de la piscina Schema generale dell installazione di una piscina NOTICE 610 860 2010 indd 8 02 02 10 09 26 ...

Страница 8: ...darauf die Pumpe und die Filtergruppe auf der gleichen Höhe wie das Schwimmbad in einem geschlossenen und dichten Raum in der Erde zu verlegen Für den ordnungsgemäßen Betrieb der Filtergruppe muss sich diese stets unterhalb des Wasserpegels befinden ACHTUNG Bei einem halb versenkten Schwimmbad müssen Sie vor der erstenWasserbefüllung zunächst ein Sicherheits und Schutzsystem erwerben und installie...

Страница 9: ...reitung der Bodenplatte Voorbereiden van de ondergrond Preparing the ground Preparación de la base de hormigón Preparazione del terreno 2 Montage paroi Montage der Seitenwände Opbouw van de wanden Erecting the sides of the pool Montaje de la pared Montaggio delle pareti NOTICE 610 860 2010 indd 10 02 02 10 09 26 ...

Страница 10: ...0 cm 3b 3d A 3e E 3f 3c 3 Vissage consoles Verschraubung der Konsolen Bevestigen van de draagsteunen Screwing in the brackets Atornillado de las consolas Avvitamento delle mensole NOTICE 610 860 2010 indd 11 02 02 10 09 26 ...

Страница 11: ... sides of the pool Montaje de los refuerzos de las paredes Montaggio dei rinforzi delle pareti 4g B 4h B 4i 4d A 4e 4f 5a 5b 5c 5d 5e 5 Préparation des parois Vorbereitung der Seitenwände Voorbereiden van de wanden Preparing the sides of the pool Preparación de las paredes Preparazione delle pareti NOTICE 610 860 2010 indd 12 02 02 10 09 26 ...

Страница 12: ...utre et liner Installation von Vlies und Schwimmbadfolie Aanbrengen van vilt en folie Installing the felting underlay and the liner Instalación del fieltro y del revestimiento Installazione del feltro e del rivestimento NOTICE 610 860 2010 indd 13 02 02 10 09 26 ...

Страница 13: ...buse et skimmer Zuschnitt der Düse und des Skimmers Uitsnijden van instroomopening en skimmer Cutting the liner and fitting the backwash inlet nozzle and the skimmer Recorte para tobera y skimmer Taglio per condotto e skimmer NOTICE 610 860 2010 indd 14 02 02 10 09 26 ...

Страница 14: ...14 7h 7i 7j 7k 7l 7m 7n 7o 7p 7q G 8 Echelles Leitern Trappen The ladders Escaleras Scale NOTICE 610 860 2010 indd 15 02 02 10 09 26 ...

Страница 15: ... automatique Einbau des automatischen Bodensaugers Installeren van de automatische vuilzuiger Putting in the automatic pool cleaner Instalación del aspirador automático Sistemazione della spazzola automatica NOTICE 610 860 2010 indd 16 02 02 10 09 26 ...

Страница 16: ...tre utilisés et stockés exclusivement selon les indications des fabricants Ne pas mélanger les produits chimiques entre eux Entreposer les produits emballages bien fermés dans un local frais et aéré ne pas les exposer directement au soleil En cas d utilisation d un récipient pour les dosages le rincer soigneusement après chaque utilisation Lire attentivement les consignes de sécurité et modes d em...

Страница 17: ...vieillissement accéléré de la ligne d eau sous l influence du soleil et des produits oxydants 1 corriger le pH faire un traitement choc et filtrer en continu pendant 48H faire un nettoyage mécanique 2 passer un détartrant et brosser les tâches puis aspirer le dépôt Oranges brunes 1 présence d algues mortes 2 eau chargée en oxyde de fer cuivre 1 brosser les parois du bassin et aspirer les dépôts 2 ...

Страница 18: ...n Die Chemikalien in gut verschlossenen Verpackungen an einem kühlen und belüfteten Raum lagern sie nicht dem direkten Sonnenlicht aussetzen Falls ein Behälter für die Dosierungen verwendet wird ihn nach jeder Benutzung sorgfältig ausspülen Die Sicherheitshinweise und die auf dem Etikett angegebenen Verwendungsarten aufmerksam lesen Alle Chemikalien außerhalb der Reichweite von Kindern aufbewahren...

Страница 19: ...gieren eine Schockbehandlung durchführen und während 48 h fortlaufend filtern eine maschinelle Reinigung durchführen 2 ein Entkalkungsmittel einführen und die Flecken abbürsten die Ablagerung dann absaugen Orange braun 1 Vorhandensein von toten Algen 2 mit Eisenoxid Kupfer belastetes Wasser 1 die Wände des Beckens abbürsten und die Ablagerungen absaugen 2 den pH Wert und die Wassertemperatur senke...

Страница 20: ...hemische producten niet met elkaar Sla de producten in gesloten verpakking op in een koele en voldoende geventileerde ruimte Stel ze niet aan direct zonlicht bloot Als u een kopje glas of iets anders gebruikt om hoeveelheden af te meten spoel dit dan goed schoon na elk gebruik Lees zorgvuldig de veiligheidsvoorschriften en gebruiksaanwijzingen op elk etiket Houd alle chemische producten buiten ber...

Страница 21: ... toe laat het filter continu lopen gedurende 48 uur en voer een mechanische schoonmaak uit 2 pas een anti aanslagmiddel toe verwijder de vlekken met een borstel en zuig de aanslag op Oranje bruin 1 aanwezigheid van dode algen 2 het water heeft hoog gehalte aan ijzer en koperoxide 1 reinig de wanden met een borstel en zuig de aanslag op 2 verlaag de pH waarde en de watertemperatuur verwijder de vle...

Страница 22: ...s that must be stored and used only as directed by the manufacturers Do not mix chemical products with each other Store products in tightly closed containers in a cool and well ventilated place do not expose to direct sunlight If using a container for measuring out chemicals rinse thoroughly after each use Read the safety information and instructions provided on each label carefully Keep all chemi...

Страница 23: ...o sun and oxidising products 1 Correct the pH level Carry out a high power cleaning treatment and run the filter for 48 hours non stop have the pool cleaned by machine 2 Use a descaler brush the stains then vacuum the deposits Orange brown 1 Dead algae 2 Water contains iron oxide or copper 1 Brush the sides of the pool and vacuum the deposits 2 Lower the pH level and the temperature of the water b...

Страница 24: ...respectivos y no deben mezclarse con otros productos químicos Almacene los productos en envases herméticamente cerrados en un lugar fresco y ventilado y no los exponga a la luz solar directa En caso de utilizar un recipiente dosificador enjuáguelo cuidadosamente tras cada uso Lea atentamente las instrucciones de seguridad y los modos de empleo indicados en las etiquetas Mantenga los productos quím...

Страница 25: ... presencia de algas 2 envejecimiento acelerado de la superficie del agua debido al sol o a los productos oxidantes 1 corregir el pH hacer un tratamiento intensivo y filtrar continuamente durante 48 h y completar con una limpieza mecánica 2 aplicar un producto disolvente y cepillar las manchas luego aspirar los depósitos Anaranjadas marrones 1 presencia de algas muertas 2 agua rica en oxido de hier...

Страница 26: ...i dei produttori Non mischiare tra di loro i prodotti chimici Depositare i prodotti con gli imballaggi ben chiusi in un locale fresco a areato e non esporli alla luce diretta del sole In caso di utilizzo di un recipiente per i dosaggi risciacquarlo con cura dopo ogni utilizzo Leggere con attenzione le disposizioni di sicurezza e le modalità d impiego indicate su ciascuna etichetta Tenere tutti i p...

Страница 27: ...otto l influsso del sole e dei prodotti ossidanti 1 correggere il pH fare un trattamento drastico e filtrare di continuo per 48 ore effettuare una pulizia meccanica 2 passare un disincrostante e spazzolare le macchie poi aspirare il deposito Arancioni brune 1 presenza di alghe morte 2 acqua ricca di ossido di ferro rame 1 spazzolare le pareti della vasca e aspirare i depositi 2 diminuire il pH e l...

Страница 28: ...liner et supprimer les plis les plus grossiers 6g Ajuster les angles du liner avec ceux de la structure 6h Mettre en eau sur 2 cm de hauteur 6i Supprimer les plis et remettre en eau 2a Principe d assemblage Utiliser pour cela la pièce martyre pour l emboîtement de tous les madriers 2b Mettre à niveau le premier rang de madriers 2c Pousser sur les extrémités des parois pour plaquer la structure sur...

Страница 29: ... Sie die größten Faltenbildungen 6g Passen Sie die Ecken der Schwimmbadfolie an die Ecken des Schwimmbads an 6h Füllen Sie Wasser bis zu einer Höhe von etwa 2 cm ein 6i Entfernen Sie die vorhandenen Falten Führen Sie die Wasserbefüllung fort 2a Prinzip des Zusammenbaus Verwenden Sie hierbei das Schlagwerkzeug zum Einfügen aller Bohlen 2b Führen Sie eine Nivellierung auf der Höhe der ersten Reihe d...

Страница 30: ...an de strips 6f Controleer of de folie goed is aangebracht en strijk de belangrijkste plooien glad 6g Zorg ervoor dat de hoeken van de folie overeenkomen met de hoeken van de constructie 6h Vul het zwembad met 2 cm water 6i Strijk alle plooien glad en vul het zwembad verder met water 2a Montageprincipe Gebruik altijd het hulpstuk om de balken goed op elkaar te laten aansluiten 2b Maak de eerste ri...

Страница 31: ... track 6f Check the position of the liner and smooth out the biggest creases 6g Adjust the corners of the liner to fit the structure 6h Fill the pool with water to a depth of 2 cm 6i Smooth out any creases and resume filling with water 2a Key point for assembling the structure Do not hammer directly on to the planks when fitting them together use the cale the protective piece of wood 2b Put in the...

Страница 32: ...ue el revestimiento esté bien puesto y suprimir los pliegues más grandes 6g Ajustar los ángulos del revestimiento a los de la estructura 6h Echar unos 2 cm de agua 6i Eliminar los pliegues y volver a echar agua 2a Principio de ensamblaje Utilizar la pieza maestra para el encaje de todos los tablones 2b Nivelar la primera fila de tablones 2c Empujar los extremos de las paredes para ajustar la estru...

Страница 33: ...nto ed eliminare le pieghe più evidenti 6g Adattare gli angoli del rivestimento a quelli della struttura 6h Mettere l acqua per un altezza di 2 cm 6i Eliminare le pieghe e rimettere acqua 2a Inizio dell assemblaggio Per questo utilizzare il pezzo martire per l incastro di tutte le assi 2b Mettere a livello la prima fila di assi 2c Spingere sulle estremità delle pareti per applicare la struttura su...

Страница 34: ...oog 87 NL 1822 BN Alkmaar Tel Sales 0031 0 72 5 671 661 Tel 0031 0 72 5 671 671 E Mail sales outsideliving com Export Outside Living Industries Nederland B V Postbus 15 NL 1800 AA Alkmaar Berenkoog 87 NL 1822 BN Alkmaar Tel Sales 0031 0 72 5 671 661 Tel 0031 0 72 5 671 671 E Mail sales outsideliving com B L Outside Living Industries BeLux BVNR Wondelgemkaai 10 B 9000 Gent Tel 32 0 9 254 45 45 Fax ...

Отзывы: