OPERATION
8
6.7
Final tightening procedure should be performed
with the supplied 1-1/2” wrench. In some cases the wrench
should be lightly hammered to insure tightness.
6.10
To mount water feed tube, slide it over the guide
post and thread the feed nut while aligning the mounting
plate bolts on the back of the gearbox.
6.8
Be sure guide post is clean & lubricated before slid-
ing core bit assembly into place on the guide post.
6.11
Turn on water.Minimize water usage, do not flood
the cut with water. Typical water consumption should be
under 1 gallon per minute.
6.9
Slide gearbox and grinder over guide post, ensuring
to engage the locking pin on hex drive.
6.12
Hold down grinder trigger and turn advancing nut
with a 3/4” wrench to core hole.
Waterworks
Division
P: 866 987-7297 F: 813-621-7125
Visit us at www.ussaws.com
WARNING:
Do not over reach, maintain control. Keep proper footing
and balance at all times. Maintain a firm grip. Use extra care using
the tool on ladders, roofs, scaffolds, etc.