OPERATION
7
Waterworks
Division
P: 866 987-7297 F: 813-621-7125
Visit us at www.ussaws.com
6.1
Mark center of core.
6.4
Remove nuts from anchor bolt.
6.2
Drill anchor hole with 3/8” masonry bit a minimum
of 5” deep, unless using toggle anchors.
6.5
Mount guide post.
6.3
Set anchor pin.
6.6
Adjust anchor point.
WARNING:
Always insure that the switch is in the “OFF” position
before plugging the unit into electrical power.
CAUTION:
Never leave the drill running unattended. Turn power off
when not in use.
CAUTION:
Once the guide post is tight, push and
pull on it several times by hand to stretch and
seat the anchor into its tightest position, then,
re-tighten the guide post. Repeat this complete
procedure three times to ensure that the guide
post is securely centered.