Operation
Operating Instructions
5-2
PPH25RR*** / 000
5.3
Preparatory operations
5.3.1
Visual inspection
Before starting work always complete the following visual inspections:
• Is the power supply earthed, fitted with a neutral conductor and a resid-
ual current circuit breaker?
• Does the mains network have fuse protection for a minimum of 45A?
• Is the cable cross section 5x6mm² (from 25m to 50m / 5x10mm²)?
• Is the water line properly connected to the Drive Unit PPH25RR***?
• Is there sufficient oil in the Drive Unit PPH25RR***?
• Is there any damage to cables or plugs?
• Has the EMERGENCY STOP been reset?
5.3.2
Connecting the Drive Unit PPH25RR***
5.3.2.1
Connecting the hoses
Information
Ensure that the water supply is not interrupted while work is in progress.
Warning
Danger from uncontrolled movements and uncontrolled escape of
oil.
Never connect or disconnect hoses while the drive unit is running.
Failure to observe this regulation may result in cut wounds or inju-
ry to body parts as well as damage to property.