3 Operating

EN Floor grinding machine FGE 450

6

Cleaning and maintenance may be done only by

trained personnel.

Maintenance must be conducted according to

the operation manual.

Do not use high pressure cleaners to clean the

machine!

Do not operate the machine in areas where

there is risk of explosion or where flammable

materials are present.

3 Operating

Risk of injury from parts flung out during grin­

ding!

Wear protective clothing and protective goggles.

Wear safety shoes!

Wear safety gloves!

Proceed with the greatest care and caution!

Danger of injury from loud noise during grinding

operation of the machine!

Always wear hearing protection when the ma­

chine is in operation!

Risk of injury from dust formation during grin­

ding work!

Connect an extractor unit to the machine or feed

in water during the grinding process.

Wear respiratory protection!

3.1 Starting up the machine

Observe the safety instructions in Chapter 2!
The initial start-up of the machine may be car­

ried out only by qualified personnel.
A visual inspection of the machine must be car­

ried out before starting up the machine.

Particular attention should be paid to damaged

or loose components, wearing and filling levels.

Always use ETX diamond tools or abrasive bonding

for the surface to be machined (e.g. some surfaces

require wet grinding).
1.

Disconnect the power plug [13, Fig. B] from the

mains.

2.

Check ETX diamond tools for function and con­

dition and replace if necessary

(

!

Chapter 4.3 ‐ page 8).

3.

Check the surface to be ground and remove any

protruding objects.

4.

Either (dry grinding)

Attach external dust extraction at the

connection to the dust extraction

[19, Fig. C].

or (wet grinding)

Check the water level in the tank [4, Fig. A]

and refill if necessary.

5.

Grip the guide handle [1, Fig. A/B] or secure

against dropping and open the clamping lever

[3, Fig. A/D].
The guide handle is unlocked.

6.

Set the guide handle to the desired position.

Operation begins in the standard position

[Fig. A].
The stretched position is intended for tool

change and for maintenance. The machine can

then be tilted backward.

Содержание HYDROSTRESS FGE 450

Страница 1: ...1 10999145_en EN Floor grinding machine FGE 450 Translation of the original operating manual 4...

Страница 2: ...2 5 2 10 7 4 1 8 Fig A 3 9 6 Fig B 15 1 12 11 14 13 16 19 Fig C 17 18 3 Fig D Fig E Fig F 20 6 21 Fig G Fig H Fig I 5 2 10 4 23 24 22 Fig J 27 26 Fig K 25 28 25...

Страница 3: ...3 Operating 6 3 1 Starting up the machine 6 3 2 Operation 7 3 3 Switching the machine off 7 4 Maintenance 8 4 1 Customer service and spare parts 8 4 2 Tilting the machine 8 4 3 Mounting and dismantlin...

Страница 4: ...IT Hydrostress AG Liability or warranty is excluded if The instructions in the operating manual have not been observed The machine or its attachments were improperly operated The maintenance was carri...

Страница 5: ...equipment must be checked for com pleteness and function before starting up The safety equipment must be mounted during operation The surfaces to be processed by the machine must be free of obstacles...

Страница 6: ...e initial start up of the machine may be car ried out only by qualified personnel A visual inspection of the machine must be car ried out before starting up the machine Particular attention should be...

Страница 7: ...g the safety switch the machine has to be held firmly by the handle of the guide bar High voltage electrical current can be fatal Do not allow the power line to be run over crushed or pulled on The di...

Страница 8: ...the stretched position Chapter 3 1 4 Tilt the machine and place it on the floor Fig HI 4 3 Mounting and dismantling ETX diamond tools The consistency of the surface to be ground determines the type o...

Страница 9: ...front position over the drive motor Chapter 3 1 or Restart the machine Chapter 3 1 page 6 5 Acceptance and transportation Observe the safety instructions in Chapter 2 5 1 Machine acceptance The packa...

Страница 10: ...o d must be carried out by 2 persons One person has to hold the carriage by the guide handle 1 Fig A B b Loosen the 4 screws 20 Fig F as far as possible without removing so that the bolts 21 Fig G are...

Страница 11: ...distance between rubber lip and the surface to be ground Chapter 3 1 page 6 Grinding pattern is uneven Tools are loose Fasten tools Tools are damaged or worn Replace tools Machine shuts down automatic...

Страница 12: ...2006 42 EG Machine Directive 2014 30 EU Electromagnetic Compatibility The following harmonised standards apply ISO 12100 Safety of Machinery EN 60204 1 Electrical Equipment of Machines EN 61000 6 2 EN...

Страница 13: ...13...

Страница 14: ...TYROLIT Hydrostress AG Witzbergstrasse 18 CH 8330 Pf ffikon ZH Switzerland Telefon 41 0 44 952 18 18 Telefax 41 0 44 952 18 00 URL www tyrolit com...

Отзывы: