STEP 6: 

Insert the battery platform 

in the bottom of the enclosure. The 

battery platform has cutouts so 

wires can be routed under the bat-

tery as needed.  

STEP 7:  

Attach the Black DIN Rail adapters to the charge controller 

using the screws provided. Use 3 screws per adapter. Clip the control-

ler to the DIN rail by hooking the bottom under the DIN rail then lifting 

the controller up and over the top lip of the DIN Rail. 

STEP 8:

 

Install 1 or 2 or 4 batteries  in a 12V or 24V configuration, de-

pending on which system you purchased.  Remove the battery cable 

fuse before connecting the batteries to avoid any accidental shorting. 

Connect  battery cables and PowerVent fan cables to the Solar Control-

ler battery input (BAT+ & BAT-), then to battery terminals. Observe 

proper polarity. Red wire is always V+. If two battery cables are sup-

plied with the system you must use both cables. If batteries are mount-

ed on their side use a rubber bumper on each terminal to prevent 

shorts. 

STEP 9:

 

Connect the 600W 48V battery charger to the Solar Controller 

PV input (PV+ & PV-). Make sure to observe proper polarity.  Brown 

wire is V+. The controller has a pluggable 3 wire AC cord. You can cut 

this cord to hardwire into the mains. You can also mount conduit to the 

enclosure if local codes require it. During operation the charger fan may 

run. This is normal. 

STEP 10: 

Mount any customer electronics to the inside of the enclo-

sure. Connect any loads to the Solar Controller LOAD output. (LOAD+ 

& LOAD-). Press red SET button to turn on/off the LOAD output. 

Note: 

There are multiple cable gland feedthrough in the bottom of the 

enclosure. If you are not using any of the feedthrough you can cut a 

short piece of wire, put it through the cable gland and tighten the cable 

gland on the wire to seal it. 

STEP 11:

 

Double check wiring and then re-install the battery cable fuse 

to energize the system, The solar controller display shows battery volt-

age, charging voltage, charging current, load current and temperature.  

CAUTION: 

Reverse polarity will damage the equipment. 

STEP 12: 

 Make sure lid gasket is clean and free from any particles, 

then close the cover, making sure that wires are clear of the seam and 

hinge area.  

STEP 13:

 

The UPSPro

®  

is Solar Ready™ so a solar panel can be add-

ed to provide supplemental or full time power. The solar panel will be 

connected to PV input (PV+ & PV-) in parallel with AC Battery Charger. 

The solar panel PV+ must be connected to the solar controller through 

an 80V-100V blocking diode (

Tycon PN 5600059

) to prevent reverse 

current to the solar panel. 

Содержание UPSPro UPS-ST-600

Страница 1: ...ghts and power circuits Contact with power lines lights or power circuits may be fatal We rec ommend to install no closer than 20 feet to any power lines Safety For your own protection follow these safety rules Perform as many functions as possible on the ground Do not attempt to install on a rainy windy or snowy day or if there is ice or snow accumulation at the install site or if the site is wet...

Страница 2: ...erVent plate STEP 3 Install hole plug in drain hole in bottom right corner of the en closure STEP 4 Mount the DIN rail to the door using screws provided Mount any extra equipment to the orange backplate and secure the backplate in the enclosure Note The DIN rail can also be mounted to the orange back plate or sides of enclosure if desired STEP 5 If pole mounting the enclo sure assemble the pole mo...

Страница 3: ...t this cord to hardwire into the mains You can also mount conduit to the enclosure if local codes require it During operation the charger fan may run This is normal STEP 10 Mount any customer electronics to the inside of the enclo sure Connect any loads to the Solar Controller LOAD output LOAD LOAD Press red SET button to turn on off the LOAD output Note There are multiple cable gland feedthrough ...

Страница 4: ...4 UPS ST12 50 600 1 Battery UPS ST24 50 600 2 Battery UPS ST24 100 600 4 Battery ...

Страница 5: ...ve Regulated Sealed Lead Acid Absorbent Glass Mat AGM Battery Life 5 Years Controller Type 40A MPPT with status display and load control Overcharge Protection 14 4V 28 8V Over discharge protection 11V 22V Over discharge recovery voltage 12 6V 25 2V Controller Self Consumption 1W Enclosure Type Powder Coated Steel Enclosure External Size 24 x 15 x 14 610 x 381 x 356mm Enclosure Internal Size 23 x 1...

Страница 6: ...6 ...

Страница 7: ...mperature For cold temperatures the capacity is reduced by 20 30 3 VENTING The enclosure is vented thru the included PowerVent The fan is thermostatically controlled to turn on when the temperature inside the enclosure exceeds 45C It runs on 12V to 24VDC 4 DUAL INPUTS The UPS ST 600 can be used with AC Power alone or Solar Power alone or a combination of both 5 SOLAR PANEL The MPPT controller used...

Страница 8: ...tery you will re duce the battery life 9 LOAD OUTPUT The LOAD output on the Solar Charge Controller is unregulated What that means is the voltage output follows the battery voltage This is typically 11 15V for a 12V system and 22 29V for a 24V system It is up to the user to make sure the connected load is compati ble with these voltages A voltage regulator can be added to provide regulated output ...

Отзывы: