2
Qwik Install
STEP 1:
Add Grounding Wire Between Door and Enclosure: Remove
plastic covers on copper studs on
inside of door and inside of enclo-
sure. Add jumper wire between 2
copper studs and use copper wash-
ers and nuts to secure.
STEP 2:
Remove the bottom cover
and replace it with the PowerVent™
included with the package. Add wire
feedthrus and any necessary con-
nectors into the bottom PowerVent™
plate.
STEP 3:
Install hole plug in drain
hole in bottom right corner of the en-
closure.
STEP 4:
Mount the DIN rail to the
door using screws provided. Mount
any extra equipment to the orange
backplate and secure the backplate in
the enclosure. Note: The DIN rail can
also be mounted to the orange back-
plate or sides of enclosure if desired.
STEP 5:
If pole mounting the enclo-
sure, assemble the pole mount kit to
the back of the enclosure and mount
the enclosure to a pole using the 6 hose clamps provided. The enclo-
sure can also be wall mounted using the 4 holes in the back of the en-
closure.
Содержание UPSPro UPS-ST-600
Страница 4: ...4 UPS ST12 50 600 1 Battery UPS ST24 50 600 2 Battery UPS ST24 100 600 4 Battery ...
Страница 6: ...6 ...