4
3
Installation
3.1
Mounting of shelf in the rack
3.1.1
Install the mounting brackets on the correct position. Respect
correct orientation. GR mounting is shown.
3.1.2
Different mounting positions.
2.2
Tools required for installation
•
FACC-ALLEN-KEY-5-350
To mount the shelf in the rack
•
FACC-CAGE-NUT-TOOL
For easy installation of cage nuts
in the rack
•
FACC-TUBE-STRIPPER-02
Loose tube stripper
•
FISTV-E7170-0003-S5027
Marker pen
2.3
Optional extras*
FIST-UST-... *
Side cable termination unit (max. 2 cables)
FIST-CT-2HU-B-2
Back cable termination unit (max. 2 cables)
FIST-MB2-2HU-M
Adaption bracket 19”- ETSI (2 pcs)
FIST-MB2-2HU-M-AS
Adaption bracket 19”-ETSI asymmetric (1 pc)
FISTV-E7187-6316
Velcro rolls for pigtail
SMOUV-1120-02
45 mm SMOUV fusion splice protections
FIST-TUBE-5MM-30
5 mm tubing
FIST-GS-FLEX-12-50
Flexible tubing, internal Ø 12 mm, 50 m
FIST-GR-TD-5MM
Tube divider 6 IN/OUT (for GR)
FIST-GPS2-TD-5MM
Tube divider 6 IN/OUT (use in GPS2)
FSA-ADK-... *
Various connector mating adaptor kits
FSA-... *
Various optical jumpers and pigtails
* see appropriate ordering guide