20
5.4.1
Fix the tubes in the middle position with tie-wraps. Don’t
squeeze the tubes.
5.3.6
Check wether all fibers are properly routed before placing the
cover on the IFC module. All fibers should be underneath the
containment lips.
24 splice module
5.3.7
You can separate each bundle of 900 micron by the split
transition plate (1).
1
1
5.3.8
Install the connectors of the first bundle (1) in the adapters and
then route the overlength in the storage area. Repeat this for the
second bundle (2). Enter the storage area (see picture above).
5.4
Installation of ribbon cable on the tray
5.3.5
Splicing repair connectors is possible : one can use the splice
holder which is premounted in the tray.