2.
2
.2
Installing the Server in an Open Rack (with Rail kit B)
In addition to rackmounting the GT14 in a 4-post rack, you
can also mount it in a 2-post rack. You
must
use rail kit B to
mount the GT14 in this type of rack.
NOTE
: Before mounting the Transport GT14 in a rack, ensure
that all internal components have been installed and that the
unit has been fully tested. Maintenance can be performed on
the unit while in a rack but it is preferable to install the device
in a fully operational condition.
1. Install the inner rail brackets to left and right sides of
chassis using 3 M4-4L(E) screws for each side.
2-post open rack
48
Chapter 2: Setting Up
Содержание Tank GT14 B5180
Страница 1: ...Tank GT14 B5180 Service Engineer s Manual...
Страница 2: ......
Страница 31: ...1 5 7 System Block Diagram Chapter 1 Overview 23...
Страница 34: ...26 Chapter 1 Overview...
Страница 82: ...74 Chapter 3 Replacing Pre Installed Components...