STEP 11: (Electrical connection) 

Make the Electrical hookup to the power unit (220V Single Phase).     

Important: the wiring must comply with local code. Have a certified electrician make the electrical hook-up to the 

power unit. Use separate circuit for each power unit. Protect each circuit with time delay fuse or circuit breaker. 

For 208V-230V single phase, use 20 amp fuse. 

Warning:  Never  operate  the  motor  in  line  voltage  less  than  208V.  Motor  damage  may  occur.    Also,  Motor 

cannot run on 50hz without a physical change to motor. 

 

STEP 12: (Checking running) 

Do not place any vehicle on the lift at this moment. Cycle the lift up 

and down several times to ensure latches click together and all air is 

removed  from  the  hydraulic  system.  To  lower  the  lift,  both  latch 

releases  must  be  manually  released  (Fig.  20).  Latches  will 

automatically  reset  once  the  lift  ascends  approximately  17

from 

base. If latches click out of sync, tighten the equalization cable on the 

one that clicks first. 

 

 

 

 

 

     

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

     

Fig. 20 

 

 

 

THE LIFT IS NOW READY FOR USE. 

Содержание TP9KAC

Страница 1: ...rop in height adapters Electric override automatic safety shut off Clear floor model Powder coated paint finish FREE mounting hardware SPECIFICATIONS TP9KAC TP9KF Capacity 9 000 lbs 9 000 lbs Lifting...

Страница 2: ...July 2015 TP9KF Two Post Floor Plate Lift Symmetric 9 000 lbs Capacity ASSEMBLY OPERATION INSTRUCTION MANUAL...

Страница 3: ...lift only part of the vehicle Improper use of this equipment could result in damage to the lift yourself or other property The lift is intended to lift vehicles only It is not designed to lift any per...

Страница 4: ...Screwdriver Vise Grips Needle Nose and Snap Ring Pliers GENERAL INFORMATION 1 Carefully remove the crating and packing materials CAUTION Be careful when cutting steel banding material as items may bec...

Страница 5: ...TP9KF July 2015 A...

Страница 6: ...re installing your new lift check the following 1 LIFT LOCATION Always use architects plans when available Check layout dimension against floor plan requirements making sure that adequate space is ava...

Страница 7: ...NCRETE Visually inspect the site where the lifts will be installed and check for cracked or defective concrete Details on Page 4 4 FLOOR REQUIREMENTS The lift should be installed on a 3000 PSI concret...

Страница 8: ...ower unit mounting bracket attached to the side Fig 5 Note the power unit column can be located on either side It is helpful to try and locate the power side on the driver side of the vehicle when loa...

Страница 9: ...ng shims as close as possible to the hole locations This will prevent bending the column base plates 7 With the shims and anchor bolts in place tighten by securing the nut to the base then turning 2 3...

Страница 10: ...quarts of fluid Fig 10 STEP 7 Routing the EQUALIZER CABLES 1 Raise and lock each carriage on the first safety latch engagement It is approximately 30 high 2 Make sure that the safety locks on each co...

Страница 11: ...on Also check the carriage height to ensure both carriages are sitting on the same latch STEP 8 Connecting the Hydraulic Hoses As shown on Figs 12 14 16 connect the hydraulic hoses When routing the hy...

Страница 12: ...the lifting swing arms on the carriages using the included 1 1 2 diameter pins Check for proper engagement of the arm restraint The rack on the arm restraints should fully engage the gear on the arm...

Страница 13: ...the motor in line voltage less than 208V Motor damage may occur Also Motor cannot run on 50hz without a physical change to motor STEP 12 Checking running Do not place any vehicle on the lift at this...

Страница 14: ...and drop into each latch stop But to lock the lift you must press the Lower level to relieve the hydraulic pressure and let the latch set tight in a safety position Always lock the lift before going u...

Страница 15: ...Have some one outside the vehicle guide the driver Always lift vehicle using all four arms Never use lift to raise one end or one side of vehicle Prior to lifting vehicle walk around the lift and che...

Страница 16: ...roduction time serious personal injury and even death Check safety lock audibly and visually while in operation Check safety latches for free movement and full engagement with rack Check hydraulic con...

Страница 17: ...and rollers Replace cables and sheaves Replace or rebuild air and hydraulic cylinders as required Replace or rebuild pumps motors as required Check hydraulic and air cylinder rod and rod end threads f...

Страница 18: ...unit A Oil reservoir overfilled B Lift lowered too quickly while under a heavy load 4 Motor hums and will not run A Lift overloaded remove excessive weight from lift B Bad capacitor call electrician...

Страница 19: ...replace them D Seals are dry in hydraulic Cylinder s OWNER EMPLOYER RESPONSIBILITIES The Owner Employer Shall establish procedures to periodically maintain inspect and care for the lift in accordance...

Страница 20: ...TP9KF July 2015 A PARTS DRAWING Fig A 1...

Страница 21: ...TP9KF July 2015 A PARTS DRAWING Fig A 2...

Страница 22: ...Top plate 2 11 Bushing 6 12 Flat washer C 2 13 Spindle spring washer A 2 13 1 Drive Over Base Plate 1 13 2 Inner Hex bolt 4 13 3 Flat washer 4 14 Rack spindle 4 15 Shaft sheath 4 16 Flat washer A 4 1...

Страница 23: ...sher 1 40 Hydraulic fitting 1 41 Elbow fitting 1 42 Hydraulic hose short 1 43 Elbow fitting 1 44 Pipe nipple 1 45 Hydraulic Hose long 1 45 1 Hydraulic fitting 45 degree 2 46 Carriage 2 47 Nylon block...

Страница 24: ...TP9KF July 2015 A ITEM DESCRIPTION QTY 63 Spindle 4 64 Chain 2 65 Steel cable 1 66 Steel cable 1 67 Nut 8...

Страница 25: ...TP9KF July 2015 A...

Отзывы: