11
TP9KF
July 2015-A
Hose Route Diagram
Fig. 18
Fig. 16
STEP 9: (Installing Lifting Arms & Arm Restraints)
Install the lifting swing arms on the
carriages using the included 1-1/2”
diameter
pins.
Check
for
proper
engagement of the arm restraint. The
rack on the arm restraints should fully
engage the gear on the arm (Figs. 17-19).
Fig.17 Fig. 18
STEP 10: Mount Drive-Over Base Plate at this time, using bolts provided (Fig 9 & 19).
Содержание TP9KAC
Страница 5: ...TP9KF July 2015 A...
Страница 20: ...TP9KF July 2015 A PARTS DRAWING Fig A 1...
Страница 21: ...TP9KF July 2015 A PARTS DRAWING Fig A 2...
Страница 24: ...TP9KF July 2015 A ITEM DESCRIPTION QTY 63 Spindle 4 64 Chain 2 65 Steel cable 1 66 Steel cable 1 67 Nut 8...
Страница 25: ...TP9KF July 2015 A...