STEP 6: (Mounting the POWER UNIT)
1. Attach the power unit to the POWERSIDE COLUMN using bolts, nuts and washers supplied (Fig. 10).
2. Remove the vent plug from the power unit and fill the reservoir with
hydraulic oil. Make sure the funnel used to fill the power unit is clean.
Suggestion: Use AW 32, or 46 Non-Detergent Non-Foaming Anti-Wear
Hydraulic Oil SAE-10 (Texaco HD46 or equal). The unit will
holds approximately ten quarts of fluid.
Fig. 10
STEP 7: (Routing the EQUALIZER CABLES)
1. Raise and lock each carriage on the first safety latch engagement. It is approximately 30” high.
2. Make sure that the safety locks on each column are fully engaged before attempting to route equalizer
cables.
3. Be sure each carriage is at the same height by measuring from the top of the base to the bottom of the
carriage. This difference should be within 1/4”.
4. Route the first cable. (See Figs. 11-13) Screw the nut on the cable stud so that half thread pass through the
nut. Pull the other end of the cable and screw the nut on it also. Then tighten both nuts.
Fig. 11 Fig. 12
Содержание TP9KAC
Страница 5: ...TP9KF July 2015 A...
Страница 20: ...TP9KF July 2015 A PARTS DRAWING Fig A 1...
Страница 21: ...TP9KF July 2015 A PARTS DRAWING Fig A 2...
Страница 24: ...TP9KF July 2015 A ITEM DESCRIPTION QTY 63 Spindle 4 64 Chain 2 65 Steel cable 1 66 Steel cable 1 67 Nut 8...
Страница 25: ...TP9KF July 2015 A...