9
TP9KAC-TUX
Mar 2019
1.
Raise OFFSIDE column and position at the designated chalk locations, ensuring the
Column
‘upright’
Extension
is pre-installed to the top of the OFFSIDE column.
2.
Using bolts provided, construct the 2 piece Overhead Beam into a one
(Fig. 8)
.
3.
Using a lifting device, raise the Overhead Beam and position on top of the column. Bolt it to the
columns using the bolts, nuts and washers
(Fig. 9)
Fig. 8
Fig. 9
4.
Use a tape measure to measure the diagonal distance between the opposite corners of the base plates
on the columns. Equal values will ensure the lifting arms will be in square.
5.
Secure OFFSIDE column to the floor following the same procedures as outlined in
STEP 4
.
STEP 6
:
(Installing POWER UNIT)
1.
Attach the power unit to the mount bracket on the side of the Main Column using bolts, nuts and
washers supplied.
(Fig. 10)
2.
Remove the vent plug from the power unit and fill the reservoir with
hydraulic oil. Make sure the funnel used to fill the power unit is
clean.
Suggestion:
Use Non-Detergent / Non-Foaming Hydraulic Oil - SAE-10,
AW 32 or equivalent. The unit holds approximately ten
quarts of fluid.
Fig. 10