
15
V01.00 | 2021/10
6.3
Operation
➤
If the device is used in low demand mode, proof tests shall be executed periodically accord-
ing to T1.
➤
Ensure that the plug connections and cables are always in good condition.
➤
The device must be replaced immediately if the terminals are faulty or the device has any vis-
ible faults.
➤
If cleaning is required, do not use any liquid or statically charging cleaning agent. Perform
proof tests after each cleaning.
➤
The proof test shall be executed each time after installation and parameterization in order to
check the requested function.
➤
The LED State is not part of the safety function.
➤
The device must not parametrized during operation.
➤
The proof test (see
) shall be executed each time after installa-
tion and parameterization in order to check the requested function.
➤
The device shall be locked against unintended operation/modification
6.4
After operation
➤
Undo the terminal connection on the device.
➤
Remove the device from its rail fixing as shown in the figure:
Fig. 4: Remove device
➤
Ensure the proper disposal of the device.
Содержание 100030003
Страница 1: ...Your Global Automation Partner Safety Manual IM X 18 DI03 4S 4T1R Isolating Switching Amplifier...
Страница 2: ...2 Hans Turck GmbH Co KG T 49 208 4952 0 F 49 208 4952 264 more turck com www turck com Contents...
Страница 4: ...4 Hans Turck GmbH Co KG T 49 208 4952 0 F 49 208 4952 264 more turck com www turck com...
Страница 19: ...19 V01 00 2021 10...
Страница 20: ...100034219 2021 10 100034219 Over 30 subsidiaries and over 60 representations worldwide www turck com...