TRANSPORT AND INSTALLATION
4
561400 - IS16/09 - EN
41/84
- the locking handles are properly tightened and the safety split pins are present between the drawbar sections;
- the lights cable is connected to the towing vehicle and is working;
- the tyre pressure is correct;
- foot 1 is fully raised.
1
4.1.2
Connect the trailer
- Adjust the drawbar height:
a) Remove the safety split pins 1.
b) Loosen the locking handles 2 until rotation between the drawbar sections is possible.
c) Adjust the angle of the sections so that the end is horizontally hooked to the vehicle (Fig. 4-7).
d) Tighten the locking handles properly (even by striking with a hard rubber mallet) and insert the safety split pins.
Содержание T20X
Страница 1: ...Serial number Year USE AND MAINTENANCE MANUAL T20X IS16 09 561400 EN ORIGINAL ...
Страница 2: ...THIS MANUAL IS PROPERTY OF TURBOSOL ANY TOTAL OR PARTIAL REPRODUCTION IS STRICTLY FORBIDDEN ...
Страница 3: ...THIS MANUAL IS PROPERTY OF TURBOSOL ANY TOTAL OR PARTIAL REPRODUCTION IS STRICTLY FORBIDDEN ...
Страница 17: ...MACHINE PRESENTATION 2 561400 IS16 09 EN 17 84 ...
Страница 39: ...SAFETY AND PREVENTION 3 561400 IS16 09 EN 39 84 ...
Страница 47: ...TRANSPORT AND INSTALLATION 4 561400 IS16 09 EN 47 84 ...
Страница 51: ...USE AND OPERATION 5 561400 IS16 09 EN 51 84 1 2 3 4 5 6 7 8 9 11 10 12 ...
Страница 62: ...5 USE AND OPERATION 62 84 561400 IS16 09 EN ...
Страница 80: ...7 DEMOLITION 80 84 561400 IS16 09 EN ...
Страница 84: ...8 TROUBLESHOOTING 84 84 561400 IS16 09 EN ...