background image

START-UP

 

diameter for a single oven and at least 1 inch (50.8 

 

mm) diameter for a double or triple oven (single or 

 

base oven) for LP or I

3P

 category gas types.

8.   Verify the size of the shut-off valve used. A minimum 

 

.75-inch (19.05 mm) ID full 

fl

 ow isvalve required 

 

for a single oven. A minimum 1-inch (25.4 mm) ID 

 full 

fl

 ow valve required for a double or triple-stacked 

oven.

9.   Verify the size of the 

fl

 ex hose used.

 

- A minimum .75-inch (19.05 mm) 

fl

 ex hose is 

required for single ovens.  

 

 

- A minimum 1-inch (25.4 mm) 

fl

 ex hose is required 

for stacked ovens.

10.  Ensure a strain-relief cable is installed to a bottom 

 

bolt hole as shown in 

fi

 gure 

Assembly, Step 10 

below 

 

and is correctly installed to the wall.

11.  Ensure that all bolt holes in the rear of the oven are 

 

plugged with the provided bolts, as shown below in 

Assembly, Step 10

.

12.  For double or triple-stacked ovens, ensure that the 

 

stacking brackets are correctly attached as shown in 

Assembly, Step 11

 below. 

13.  Ensure that each chain is set to the correct tension. 

 

Grasp the chain as shown in 

Assembly, Step 12

 

 

below. The chain must have enough freedom to 

 

move between 1/4 inch (6mm) and 3/8 inch (10mm) 

 

to be at the correct tension. If the tension is too loose 

 

or too tight, reset the tension.

Assembly

1.  Ensure the legs are securely attached.
2.   Ensure the leg bolts are tightened.
3.   Ensure the window is correctly installed. Refer to    

 

page 8 STEP 6.

4.   Ensure the conveyor belt assembly is correctly 

 

installed. Refer to page 7 STEPS 5.7-5.9.

5.   Verify that the oven is co

fi

 gured to drive the belt in 

 

the correct direction (see below illustrations).

 

a.  Open the right end bell.

 

b.  Remove the front panel from the CMSC.

 

c.  Ensure the conveyor drive is set to the correct 

  direction.

 

 

i. For left to right con

fi

 gurations (-1), ensure 

the far right wire is inserted into DIN2 as 

shown in 

fi

 gure 

Assembly, Step 5.c.i

 below.

 

 

ii. For right to left con

fi

 gurations (-2), ensure 

 

 

 the far right wire is inserted into DIN3 as 

shown in 

fi

 gure 

Assembly, Step 5.c.ii

 below.

6.   Verify the direction the belt travels matches 

fi

 gure 

Assembly, Step 6

 below. If not, the belt must be 

 reversed.
7.   Verify the size of the gas supply line. The gas supply 

 

line  at the appliance must be at least 1 inch 

 

(25.4 mm) diameter for a single oven and at least 2 

 

inch (50.8 mm) diameter for a double or triple oven 

 

(single or base oven) for Nat, I

2H

, I

2E

, I

2E+

, and I

2L

 

 

category gas types. The gas supply line at the 

 

appliance must be at least .75 inch (19.05 mm) 

Assembly, Step 5.b

Assembly, Step 5.c.i

Assembly, Step 6

Assembly, Step 13

10

Assembly, Step 11

Assembly, Step 12

Assembly, Step 10

OV

A1

10V

A0

24

DIN1

DIN2

DIN3

RL1

RL2

Assembly, Step 5.c.ii

OV

A1

10V

A0

24

DIN1

DIN2

DIN3

RL1

RL2

Содержание HHC-3240

Страница 1: ... Manual for the turbochef high h conveyor oven WARNING The initial start up pages 9 A1 MUST be performed by an authorized service technician If the initial start up is not performed by an authorized service technician the oven s warranty will be VOID ...

Страница 2: ......

Страница 3: ...For further information call 800 90TURBO or 1 214 379 6000 ...

Страница 4: ...s important for the proper installation of this oven Errors descriptive typographic or pictorial are subject to correction Specifications are subject to change without notice PLEASE CAREFULLY READ THIS MANUAL AND RETAIN IT FOR FUTURE REFERENCE ...

Страница 5: ... THE OVEN 4 STEP 3 INSTALL THE INLET GAS PIPE 5 STEP 4 STACK THE OVENS 5 STEP 5 INSTALL THE COMPONENTS 7 STEP 6 INSTALL THE WINDOW SELECT MODELS ONLY 8 Start Up Start Up Overview 9 Assembly 10 Connections 11 Gas 11 Ventilation 12 Start Up Checklist 13 Customer Checklist 13 Initial Start Up Checklist 14 Initial Start Up Checklist Form A1 ...

Страница 6: ...0 50 L to R HHC 6661 2 Conveyor 50 50 R to L HHC 6662 1 Conveyor 70 30 L to R HHC 6662 2 Conveyor 70 30 R to L HHC 6374 Cooling tube HHC 6464 Cover left lower HHC 6525 Cover left upper HHC 6463 Cover right lower HHC 6524 Cover right upper HHC 6574 Crumb tray kit for single or base oven HHC 6575 Crumb tray kit for middle or top oven HHC 6411 Guard chain HHC 6850 26 Leg kit for single oven HHC 6850 ...

Страница 7: ...ng pole through the lifting brackets The lifting pole must be to the following specifications 10 feet 3 05 m long 1 5 inch 38 1 mm diameter schedule 40 steel 1 4 Two lifts are required to lift the oven Position the lifts at each end of the oven and connect the lifting pole to the lifts using the lifting adapters WARNING Insert safety pins through the lifting pole as shown in the adjacent figure or...

Страница 8: ... the lifting brackets 2 4 Re position the lifts and re attach the lifting adapters to the lifting pole WARNING Insert safety pins through the lifting pole or place pipe caps on the ends whichever applies DANGER The oven is top heavy and will tip Position someone to steady the oven during lifting as shown in STEP 1 5 page 3 to minimize the risk of tipping 2 5 Using the lifts slowly raise the oven K...

Страница 9: ...nd when installing gas pipes DO NOT use Teflon tape as thread sealant 3 1 Remove the oven s back panel and install the 10 254mm gas pipe inlet refer to page 2 as shown adjacent The 10 254mm gas pipe inlet is only used on a single or bottom oven NOTE If installing a single oven proceed to STEP 5 page 7 4 1 If installing a double or triple stacked oven remove the gas pipe plug in the top of the base...

Страница 10: ...casters of the base oven 4 13 Lower the raised oven onto the base ovens 4 14 Remove the maneuvering casters from the back of the oven 4 15 Immediately discard the maneuvering casters These casters are not designed to be used again 4 16 Ensure that all the holes in the rear of the oven are plugged with the provided bolts 4 17 Install the stacking brackets to the middle and top ovens Both stacking b...

Страница 11: ...r is specific to the left and right sides of the oven s 5 7 Install the conveyor belt assembly on the oven The conveyor belt assembly can only be installed from the right side of the oven 5 8 Maneuver the conveyor into position by lifting both ends and moving it slightly back and forth until it catches in place Once the conveyor is in place you should not be able to move it unless you lift the end...

Страница 12: ... 2 STEP 6 INSTALL THE WINDOW SELECT MODELS ONLY 6 1 Remove the right hand window bracket 6 2 Insert the left side of the window into the left hand bracket 6 3 Insert the right side of the window into the previously removed right hand bracket 6 4 Install the supplied screw refer to page 2 in the top hole of the bracket and securely tighten 6 5 Install the supplied screw refer to page 2 in the botto...

Страница 13: ... remain disconnected and will remain out of warranty until all failing items are corrected and TurboChef is notified that the oven has passed all tests Required Equipment 5mm nut driver 8mm nut driver Digital manometer P N HHC 3001 Gas connection kit Single oven P N HHC 6580 Stacked oven P N HHC 6579 Leak test materials Philips head screw driver Smoke tester Straight blade screw driver Maintenance...

Страница 14: ...nsion Assembly 1 Ensure the legs are securely attached 2 Ensure the leg bolts are tightened 3 Ensure the window is correctly installed Refer to page 8 STEP 6 4 Ensure the conveyor belt assembly is correctly installed Refer to page 7 STEPS 5 7 5 9 5 Verify that the oven is cofigured to drive the belt in the correct direction see below illustrations a Open the right end bell b Remove the front panel...

Страница 15: ... 14 94mb and no more than 14 W C 350 6 mm H2 O 34 87 mb Otherwise severe damage to the equipment can occur Connections Leak testing all connections is required NOTE TurboChef suggests using a soap solution however check with the local code authority to ensure that no other test is required refer to the regulations in force in the country in which the appliance is being installed The prevailing aut...

Страница 16: ... 260 C 5 Turn the oven on and select a cooking profile During warmup or while both fan speeds are set to 65 verify the gas pressure at the main burner during 100 flame Take this reading from the lower tap of the gas valve fig Gas Steps 4 7 This tap shows the gas valve s internal regulator settings The maximum operating pressure for natural gas and propane is 3 5 W C 88 9 mmH2 O 8 71 mb unless oper...

Страница 17: ...o select the belt Multiple belt ovens will have front and rear options v Press and hold the down arrow until the display shows the lowest belt speed vi Ensure that the oven has reached 500 F 260 C d Light and place the smoke tester on a non combustible plate e Place the plate on the conveyor in the middle of the oven 2 Verify the ventilation hood passes the smoke test If 80 of the smoke is capture...

Страница 18: ... minimum 1 inch 25 4 mm I D full flow valve is required for double or triple ovens Ventilation Operable at the time of this Start Up NOTE It is the recipient s responsibility to report to the freight company any concealed or non concealed damage Check the oven attachments installation kit and oven shipping container for damage The freight company must be notified of any claims IMMEDIATELY NOTE It ...

Страница 19: ...ed 10 Installed strain relief cable 11 Holes in the rear of the oven plugged 12 If applicable are the stacking brackets correctly installed 13 Is the chain set to the correct tension Connections Checklist page 11 1 Soap tested all connections for gas leaks 2 Breaker size 3 Individual breakers for each unit 4 Factory supplied electrical plug used 5 Voltage readings at the terminal block L1 L2 L1 Gr...

Страница 20: ......

Страница 21: ......

Страница 22: ...x Concourse Parkway Suite 1900 Atlanta Georgia 30328 USA 1 678 987 1700 PHONE 1 678 987 1750 FAX Global Operations 4240 International Pkwy Suite 105 Carrollton Texas 75007 USA 1 214 379 6000 PHONE 1 214 379 6073 FAX Customer Service 800 90TURBO 1 214 379 6000 turbochef com Part Number HHC 6651 Rev C May 2008 Country Code NA EU Accelerating the World of CookingTM ...

Отзывы: