FIG. 17
Attach the
Pec Dec Cable (#38)
to the cable retainer
bracket of the
Aluminum Cam Plate (#34)
.
Note:
Refer to
Fig. C1
on fold-
out page 10 for further illustra-
tion of this assembly.
FIG. 20
Secure the cable-ends of the Pec Dec Cable (#38) within
the cable retainers brackets of the Aluminum Cam Plates (#34) using
two Socket Head Cap Screws 1/4-20 X 3/4 (#48). Use the supplied
Hex Key 3/16” (#64) to fasten these Socket Head Cap Screws.
Note:
Refer to
Fig C2
on fold-out page 10 for further illustra-
tion of this assembly.
FIG. 19
Continue routing the
Pec Dec Cable (#38)
down and under
the Nylon Pulley 4 1/2 Rd. (#14-Labeled F). Conclude the cable rout-
ing by inserting the cable to the cable retainer bracket of the
Alumi-
num Cam Plate (#34)
.
F
FIG. 18
Route the
Pec Dec Cable (#38)
under the Nylon Pulley 4
1/2 Rd. (#14-Labeled D) then up and over the Nylon Pulley 4 1/2 Rd.
(#14-Labeled E).
6
Owner’s Manual: Assembly Instructions
SP-405 Pectoral Contractor
38
34
30
D
E
38
28
33
34
38
31
34
34
48
48