background image

FIG. 17     

Attach the 

Pec Dec Cable (#38)

 to the cable retainer 

bracket of the 

Aluminum Cam Plate (#34)

 

Note:

 Refer to 

Fig. C1

 on fold-

 

out page 10 for further illustra-

tion of this assembly. 

FIG. 20     

Secure the cable-ends of the Pec Dec Cable (#38) within 

the cable retainers brackets of the Aluminum Cam Plates (#34) using 
two Socket Head Cap Screws 1/4-20 X 3/4 (#48).  Use the supplied 
Hex Key 3/16” (#64) to fasten these Socket Head Cap Screws. 
 

Note:

  Refer to 

Fig C2

 on fold-out page 10 for further illustra-

tion of this assembly. 

FIG. 19     

Continue routing the 

Pec Dec Cable (#38)

 down and under 

the Nylon Pulley 4 1/2 Rd. (#14-Labeled F).  Conclude the cable rout-
ing by inserting the cable to the cable retainer bracket of the 

Alumi-

num Cam Plate (#34)

FIG. 18     

Route the 

Pec Dec Cable (#38)

 under the Nylon Pulley 4 

1/2 Rd. (#14-Labeled D) then up and over the Nylon Pulley 4 1/2 Rd. 
(#14-Labeled E). 

Owner’s Manual: Assembly Instructions 

SP-405  Pectoral Contractor 

38 

34 

30 

38 

28 

33 

34 

38 

31 

34 

34 

48 

48 

Содержание SP-405

Страница 1: ...n Date 02 21 03 TABLE OF CONTENTS Introduction Pg 1 Safety Precautions Pg 1 Assembly Pg 2 Pg 9 Cable Adjustment Pg 7 Cable Mapping Diagram Fold out Pg 10 Exploded View Diagram Fold out Pg 11 Parts Lis...

Страница 2: ...ave a question or problem regarding the proper assembly of this unit 2 Neatly organize and identify all parts according to the Parts List and the Exploded View Diagram Tool Requirements 1 One 3 4 comb...

Страница 3: ...er s Manual Assembly Instructions 2 SP 405 Pectoral Contractor 1 51 51 3 1 28 7 6 3 6 13 13 7 3 6 Label 4 FIG 2 Remove the Guide Rod Retainer 4 and the Top Plate Selector Bar 7 to allow the assembly o...

Страница 4: ...Cap Screws 3 8 16 X 4 1 4 54 four Flat Washers SAE 3 8 17 and two Nylon Insert Lock Nuts 3 8 16 55 FIG 7 Attach the Front Frame 29 to the Guide Rod Retainer 4 and the Weight Stack Frame 1 using two H...

Страница 5: ...hardware as sembly at this time as it will be completely fastened later in the assembly process Note Refer to Fig A on fold out page 10 for further detailed il lustration of this assembly FIG 10 Adhe...

Страница 6: ...1 2 Rd 14 Labeled D F to the Base Frame 28 pulley brackets using two Hex Head Cap Screws 3 8 16 X 2 24 four Flat Washers SAE 3 8 17 and two Nylon Insert Jam Lock Nut 3 8 16 21 59 63 7 39 5 SP 405 Pec...

Страница 7: ...to fasten these Socket Head Cap Screws Note Refer to Fig C2 on fold out page 10 for further illustra tion of this assembly FIG 19 Continue routing the Pec Dec Cable 38 down and under the Nylon Pulley...

Страница 8: ...ll be completely fastened later in the assembly process Cable Adjustment 1 Loosen the Finished Hex Nut 1 2 13 62 2 Thread the Cable Hex Tap Bolt 1 2 13 X 3 61 in or out of the threaded socket of the F...

Страница 9: ...ic Shroud Gap Cover 8 and the Plastic Shroud Edge Protectors 10 10 2 FIG 24 Affix the Weight Shroud 2 to the bottom of the Weight Stack Frame 1 and at the top of the Guide Rod Retainer 4 us ing four H...

Страница 10: ...shown above using two Hex Head Cap Screws 3 8 16 X 3 53 and two Flat Washers SAE 3 8 17 29 29 35 9 SP 405 Pectoral Contractor 36 FIG 26 Affix the Seat Pad 35 to the Adjustable Seat Frame 40 using two...

Страница 11: ...7 2 20 NYLON INSERT LOCK NUT B O 1 2 13 BNH0212 4 61 CABLE HEX TAP BOLT 1 2 13 X 3 BNH1048 1 21 NYLON INSERT JAM LOCK NUT B O 3 8 16 BNH0365 8 62 FINISHED HEX NUT B O 1 2 13 BNH0201 1 22 HEX HEAD CAP...

Страница 12: ...sts on returned or replaced equipment to and from TuffStuff s facility in Pomona THE FORGOING SHALL CONSTITUTE THE SOLE REMEDY OF THE PURCHASER AND THE SOLE LIABILITY OF TUFFSTUFF WITH REGARD TO WARRA...

Отзывы: