FIG. 1
Using a rubber mallet, insert three Plastic End Caps 2 X 3
(#51) onto the tube-ends of the
Base Frame (#28)
. Next, on a flat
surface attach the
Base Frame (#28)
to the assembled
Weight Stack
Frame (#1)
, in the position as shown above, and secure it into place
using two Hex Head Cap Screws 1/2-13 X 3 1/2 (#22), four Flat
Washers SAE 1/2” (#27), and two Nylon Insert Lock Nuts 1/2-13
(#20).
Note:
Use the overhead view on the cover page for designing
your layout before assembling.
Owner’s Manual: Assembly Instructions
2
SP-405 Pectoral Contractor
1
51
51
3
1
28
7
6
3
6
13
13
7
3
6
Label
4
FIG. 2
Remove the
Guide Rod Retainer (#4)
, and the
Top Plate
Selector Bar (#7)
to allow the assembly of the weight plates.
FIG. 3
Carefully begin sliding the Weight Plates (#6) onto the
Guide Rods (#3)
, in position as shown above, allowing the first one
to rest on top of the Rubber Donuts (#13).
FIG. 4
Slide the
Top Plate Selector Bar (#7)
onto the
Guide
Rods (#3)
allowing it to rest on top of the completed Weight Stack.
Note:
Be sure the
label
on the
Top Plate Selector Bar (#7)
is
facing out, as shown above, before sliding the
Top Plate Se-
lector Bar (#7)
onto the
Guide Rods (#3)
.
51
28
3