![Tuchel Kompakt HD 400 Series Скачать руководство пользователя страница 29](http://html.mh-extra.com/html/tuchel/kompakt-hd-400-series/kompakt-hd-400-series_operating-manual_1179279029.webp)
9
Attachment
. Frontal attachment with -point linkage
Before carrying out the following tasks irst read
the safety instructions in Chapter 2 - Safety.
Also, familiarise yourself with the task sequence
described.
• Check the receptacle for soiling. Clean if necessary.
• Drive the carrier vehicle towards the sweeping machine.
• Select the bolt diameter (1) according to the attachment
category, hook and lock the draft link hook rods.
• Select the holes (2) for the upper hook bolt according
to the attachment category and attach and secure the
upper hook and the upper hook bolt.
• Adjust the upper hook so that the attachment receptacle
is perpendicular to the ground (see also the operating
manual for the carrier vehicle).
• Verify the correct seating of the attachment receptacle.
• Mount the drive shaft on the tractor's side and hook the
chain of the anti-twist device into a suitable location.
• If present, connect the hydraulic lines according to the
instructions of the vehicle manufacturer.
• Lift the sweeping machine and carry out a functionality
check.
• Lower the sweeping machine until the two (or three)
castor wheels touch the ground.
The receptacle structure must be
perpendicular to the ground.
N O T E
Содержание Kompakt HD 400 Series
Страница 1: ... Preface Operating Manual Sweeping Machine ...
Страница 2: ...Preface ...
Страница 4: ...Preface ...
Страница 58: ...Appendix Circuit diagrams for power take off drive Hydraulic emptying Hydraulic emptying side broom ...
Страница 59: ... 9 Appendix Circuit diagrams for hydraulic operation Hydraulic drive Hydraulic emptying Hydraulic drive ...
Страница 60: ...Appendix 0 Hydraulic emptying side broom Hydraulic drive ...