Installation Of Plastic
Plastic from factory has a natural
tack
on inside. In event of plastic being stored for an extended period of time, the
tack may migrate to opposite side. To test for
tacky
side, fold plastic inside to inside and pull apart. Fold opposite
(top to top) to determine tackier side.
The roll of plastic should be installed with
tack
on inside of the plastic film next to the bale of silage. The plastic
then passes over the slave roller and is threaded through the two metal rollers on the tensioner as shown in the
diagram.
The two metal stretcher rollers rotate at different speeds. This causes the plastic to be stretched. It is very important
that the plastic goes over the slow roller first and the faster roller second.
If there is any question on which is the faster roller:
1.
Place a pen mark on each roller and rotate one roller one turn.
2.
Check the location of the mark on the other roller.
If it has advanced further, then it is the fast roller.
If it has advanced less, then it is the slow roller.
When the plastic is installed correctly, it should stretch tight on the bale to form a smooth tube.
Содержание TL5500 2004
Страница 20: ...Hoop Item Description 1 Outer Ring 2 Inner Ring 3 5 8 x 2 Bolt 4 5 8 Nut 5 5 8 Lockwasher 6 5 8 x 3 Bolt...
Страница 21: ...Hoop Wheels Item Description 1 4 inch Wheel 2 Axle Bolt Locknut 3 Spanner...
Страница 29: ...Brakes Item Description 1 Rocker Tube 2 Brake Eccentric 3 x3 Bolt 4 Lockwasher 5 Nut 6 2 x 8 Hydraulic Cylinder...
Страница 35: ...Push Off Channel Item Description 1 Right Hand Push Channel 2 Left Hand Push Channel 3 Lock Pin 4 Push Off Tube...
Страница 37: ...Mud Flap Item Description 1 Mud Flap 2 Metal Strip 3 Bolt 4 Lockwasher 5 Nut...
Страница 48: ...Manual Hydraulic Schematic...
Страница 49: ...Electric Hydraulic Schematic...
Страница 50: ...Electric Control Panel Schematic...
Страница 70: ......
Страница 71: ...Tube Line 5500 Wiring...